Two-stage robust optimization for the integrated dynamic berth allocation and quay crane scheduling problem under uncertainty

被引:0
|
作者
Ran, Lingyu [1 ]
Cheng, Yongxi [1 ,2 ]
Zhang, Guiqing [3 ]
机构
[1] Xi An Jiao Tong Univ, Sch Management, Xian, Peoples R China
[2] State Key Lab Mfg Syst Engn, XIAN, Peoples R China
[3] Xi An Jiao Tong Univ, Sch Econ & Finance, Xian, Peoples R China
关键词
Operations research in maritime industry; berth allocation; quay crane scheduling; robust optimization; uncertainty; DESIGN;
D O I
10.1080/0305215X.2024.2435539
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A container port is an important cargo transit node that links the land and maritime regions, with berth allocation and quay crane scheduling tasks. Often, bad weather and delays in loading information make vessels' navigation uncertain. Therefore, in contrast to the classical berth allocation and quay crane assignment and scheduling problem, which minimizes the makespan, this study proposes a novel two-stage robust mixed-integer linear programming model for the integrated dynamic berth allocation and time-variant quay crane scheduling problem to minimize the total departure time, under uncertainties of vessel arrival time and container demand. An extended column constraint generation algorithm with a variable reduction strategy is designed to solve the model. Extensive computational experiments are performed to verify the effectiveness of the proposed model and algorithm. The conclusions drawn from this study could provide operational guidance for container operators to deal with uncertainties.
引用
收藏
页数:23
相关论文
共 50 条
  • [1] Robust optimization for the integrated berth allocation and quay crane assignment problem
    Wang, Chong
    Miao, Lixin
    Zhang, Canrong
    Wu, Tao
    Liang, Zhe
    NAVAL RESEARCH LOGISTICS, 2024, 71 (03) : 452 - 476
  • [2] A two-stage robust optimization approach for the berth allocation problem under uncertainty
    Liu, Changchun
    Xiang, Xi
    Zheng, Li
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2020, 32 (02) : 425 - 452
  • [3] A two-stage robust optimization approach for the berth allocation problem under uncertainty
    Changchun Liu
    Xi Xiang
    Li Zheng
    Flexible Services and Manufacturing Journal, 2020, 32 : 425 - 452
  • [4] Berth allocation and quay crane assignment/scheduling problem under uncertainty: A survey
    Rodrigues, Filipe
    Agra, Agostinho
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 303 (02) : 501 - 524
  • [5] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [6] A robust optimization approach to the integrated berth allocation and quay crane assignment problem
    Shang, Xiao Ting
    Cao, Jin Xin
    Ren, Jie
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2016, 94 : 44 - 65
  • [7] An almost robust optimization model for integrated berth allocation and quay crane assignment problem
    Xiang, Xi
    Liu, Changchun
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2021, 104
  • [8] Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: A robust exact decomposition
    Chargui, Kaoutar
    Zouadi, Tarik
    Sreedharan, V. Raja
    COMPUTERS & OPERATIONS RESEARCH, 2023, 156
  • [9] The Integrated Rescheduling Problem of Berth Allocation and Quay Crane Assignment with Uncertainty
    Zheng, Hongxing
    Wang, Zhaoyang
    Liu, Hong
    PROCESSES, 2023, 11 (02)
  • [10] MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
    Agra, Agostinho
    Oliveira, Maryse
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 264 (01) : 138 - 148