Berth Allocation and Quay Crane Assignment Considering the Uncertain Maintenance Requirements

被引:0
|
作者
Li, Siwei [1 ]
Song, Liying [1 ]
机构
[1] Beijing Jiaotong Univ, China Transportat Res Ctr, Sch Transportat, Beijing 100044, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2025年 / 15卷 / 02期
关键词
berth allocation; quay crane assignment; resilience; maintenance activities; bi-level programming;
D O I
10.3390/app15020660
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The strategic optimization of a container terminal's quayside assets, including the berth and quay cranes, is crucial for maximizing their deployment and utilization. The interrelated and complex challenges of Berth Allocation (BAP) and Quay Crane Scheduling (QCSP) are fundamental to enhancing the resilience of container ports, as berths and quay cranes constitute essential infrastructure. Efficient berth allocation and quay crane scheduling can mitigate operational disruptions, even in the face of maintenance or failures, thereby improving both operational reliability and resilience. However, previous studies have often overlooked the uncertainty associated with quay crane maintenance when planning these operations. This paper aims to minimize vessel turnaround time by accounting for the uncertain in quay crane maintenance activities. To address this novel problem, we propose a proactive-reactive method that incorporates a reliability-based model into the Swarm Optimization with Differential Evolution (SWO-DE) algorithm. Computational results confirm the practical relevance and effectiveness of our proposed solution methods for container terminals.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Integrated berth allocation and quay crane assignment with uncertain maintenance activities
    Li, Ying
    Chu, Feng
    Zheng, Feifeng
    Kacem, Imed
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 248 - 253
  • [2] Integrated berth allocation and quay crane assignment with maintenance activities
    Zheng, Feifeng
    Li, Ying
    Chu, Feng
    Liu, Ming
    Xu, Yinfeng
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (11) : 3478 - 3503
  • [3] Berth allocation and quay crane assignment considering the adoption of different green technologies
    Yu, Jingjing
    Tang, Guolei
    Voss, Stefan
    Song, Xiangqun
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2023, 176
  • [4] Berth Allocation and Quay Crane Assignment Under Uncertainties
    Tan, Caimao
    He, Junliang
    Wang, Yuancai
    TRANSDISCIPLINARY ENGINEERING FOR COMPLEX SOCIO-TECHNICAL SYSTEMS - REAL-LIFE APPLICATIONS, 2020, 12 : 263 - 270
  • [5] A Genetic Algorithm for Berth Allocation and Quay Crane Assignment
    Rodriguez-Molins, Mario
    Barber, Federico
    Sierra, Maria R.
    Puente, Jorge
    Salido, Miguel A.
    ADVANCES IN ARTIFICIAL INTELLIGENCE - IBERAMIA 2012, 2012, 7637 : 601 - 610
  • [6] Functional integration approach for the berth allocation, quay crane assignment and specific quay crane assignment problems
    Karam, A.
    Eltawil, A. B.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 102 : 458 - 466
  • [7] A genetic algorithm for robust berth allocation and quay crane assignment
    Rodriguez-Molins M.
    Ingolotti L.
    Barber F.
    Salido M.A.
    Sierra M.R.
    Puente J.
    Progress in Artificial Intelligence, 2014, 2 (4) : 177 - 192
  • [8] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [9] Modeling berth allocation and quay crane assignment considering QC driver cost and operating efficiency
    He, Junliang
    Wang, Yu
    Tan, Caimao
    Yu, Hang
    ADVANCED ENGINEERING INFORMATICS, 2021, 47
  • [10] The berth allocation and quay crane assignment problem with crane travel and setup times
    Correcher, Juan F.
    Perea, Federico
    Alvarez-Valdes, Ramon
    COMPUTERS & OPERATIONS RESEARCH, 2024, 162