A robust bi-objective model for project portfolio selection and adjustment considering the implementation capability deviation of projects

被引:0
|
作者
Shen, Zhong [1 ,2 ]
Li, Xingmei [1 ,2 ]
Lv, Xiaoyan [1 ,2 ]
Li, Fengyun [1 ,2 ,3 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing, Peoples R China
[2] North China Elect Power Univ, Beijing Key Lab New Energy & Low Carbon Dev, Beijing, Peoples R China
[3] Anhui Univ Finance & Econ, Sch Econ, Bengbu, Peoples R China
基金
中国国家自然科学基金;
关键词
Project portfolio; Implementation capability; Project portfolio selection and adjustment; Project management; Uncertainty; FUZZY ENVIRONMENT; SUSTAINABILITY;
D O I
10.1016/j.cie.2025.110877
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The implementation capability of projects to strategic goals is used as an important criterion for selecting and adjusting project portfolio (PP). However, the existing research ignored the fact that the actual implementation capability of projects may be lower than the expected value, which is defined as implementation capability deviation (ICD), and didn't pay enough attention to responding to ICD, leading to the failure of the selected PP to achieve strategic goals. Under this circumstance, this paper studies the influence of ICD on realizing strategic goals and explores how to repair ICD in the process of project portfolio selection and adjustment (PPSA). Firstly, the ICD of projects is classified and quantified in an uncertain environment. Secondly, considering the multiple adjustment options to PP, the robust constraint for the improved implementation capability of PP is constructed to respond to ICD. Finally, a bi-objective optimization model for PPSA is constructed to minimize the cost of inputs and to maximize the strategic benefits of PP. The analysis of a case study demonstrates that the proposed method facilitates managers to assess and respond to ICD by dynamically adjusting PP holdings to achieve strategic goals in an uncertain environment.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Bi-objective project portfolio selection in Lean Six Sigma
    Kalashnikov, Vyacheslav
    Benita, Francisco
    Lopez-Ramos, Francisco
    Hernandez-Luna, Alberto
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2017, 186 : 81 - 88
  • [2] A milp bi-objective model for static portfolio selection of R&D projects with synergies
    Litvinchev, I.
    Lopez, F.
    Escalante, H. J.
    Mata, M.
    JOURNAL OF COMPUTER AND SYSTEMS SCIENCES INTERNATIONAL, 2011, 50 (06) : 942 - 952
  • [3] Project portfolio management considering the commitment of agents: A bi-objective model applied to administrative services
    Noro, Jorge
    Dias, Luis C.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2023, 74 (04) : 1049 - 1062
  • [4] A milp bi-objective model for static portfolio selection of R&D projects with synergies
    I. Litvinchev
    F. López
    H. J. Escalante
    M. Mata
    Journal of Computer and Systems Sciences International, 2011, 50 : 942 - 952
  • [5] Bi-objective project portfolio selection and staff assignment under uncertainty
    Gutjahr, Walter J.
    Reiter, Peter
    OPTIMIZATION, 2010, 59 (03) : 417 - 445
  • [6] A fuzzy bi-objective mathematical model for optimum portfolio selection by considering inflation rate effects
    Sadoullah Ebrahimnejad
    Mohammad Hossein Hosseinpour
    Ali Mohammadi Nasrabadi
    The International Journal of Advanced Manufacturing Technology, 2013, 69 : 595 - 616
  • [7] A fuzzy bi-objective mathematical model for optimum portfolio selection by considering inflation rate effects
    Ebrahimnejad, Sadoullah
    Hosseinpour, Mohammad Hossein
    Nasrabadi, Ali Mohammadi
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (1-4): : 595 - 616
  • [8] A collective efficacy-based approach for bi-objective sustainable project portfolio selection using interdependency network model between projects
    Ebnerasoul, Mohadeseh
    Ghannadpour, Seyed Farid
    Haeri, Abdolrahman
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2023, 25 (12) : 13981 - 14001
  • [9] A collective efficacy-based approach for bi-objective sustainable project portfolio selection using interdependency network model between projects
    Mohadeseh Ebnerasoul
    Seyed Farid Ghannadpour
    Abdolrahman Haeri
    Environment, Development and Sustainability, 2023, 25 : 13981 - 14001
  • [10] Bi-objective optimization of a project selection and adjustment problem under risk controls
    Heidari-Fathian, Hassan
    Davari-Ardakani, Hamed
    JOURNAL OF MODELLING IN MANAGEMENT, 2020, 15 (01) : 89 - 111