Rate of penetration prediction for large-diameter offshore drilling for wind farm structures

被引:0
|
作者
Abbasov, Abbas [1 ]
Abbasov, Tural [2 ]
Merey, Sukru [3 ]
机构
[1] Heriot Watt Univ, Sch Energy Geosci Infrastruct & Soc, Edinburgh, Scotland
[2] Warsaw Univ Technol, Dept Mech & Ind Engn, Plac Politechn 1, PL-00661 Warsaw, Poland
[3] Batman Univ, Dept Petr & Nat Gas Engn, TR-72100 Batman, Turkiye
关键词
Drilling; Bit; Windfarms; Sustainable energy; Energy; Geo-energy;
D O I
10.2516/stet/2024113
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
It is essential to shift towards sustainable energy in a world with increased awareness of global warming and climate change. There is an anticipated increase in offshore wind farms in the upcoming years. There is a need to explore new locations in tougher soil conditions for the wind farm developments as the sweet spots or technically easy spots have been taken. The rock strength must be overcome in the new locations of concern. Due to pile buckling the conventional pile driving technique becomes an undesirable solution. An alternative method that can complete wind farm infrastructure efficiently in challenging soil and rocks is drilling. In addition, there are some regions where pile driving becomes unviable due to the rules associated with maximum noise levels. The cost of the project increases significantly in the case of the use of noise mitigation measurements. Again, drilling can be considered as an alternative solution, because as a result, the noise generated during installation decreases significantly. The important role in the total drilling process is the drilling phase itself, and it can easily be equal to more than half of the total pile installation time. It is necessary to have a very decent prediction of the drilling rate for the installation of a large number of foundation piles, especially since it is important to have this information during the tender phase of a project. The currently available drilling rate models are based on empirical evidence and tend to be specific to certain drilling methods in each type of rock. This study aims to better predict the drilling rate which will be applicable for different amounts of large-diameter drilling for various rock and soil types. Significant importance will be given to the analysis of conventional top-hole drilling performance. Investigation of top hole and deep hole drilling bit design will be conducted and its applicability to soil drilling for windfarm installation will be tested.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] Prediction for pile running of large-diameter steel pipes pile for offshore wind power
    Shen J.
    Qian L.
    Shi R.
    Yang Y.
    He B.
    Yang Z.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2023, 45 : 158 - 161
  • [2] Diffraction of partially coherent wind waves on a large-diameter vertical cylindrical pole of an offshore drilling platform
    Kuz'min G.P.
    Power Technology and Engineering, 2005, 39 (1) : 27 - 32
  • [3] DRILLING OF LARGE-DIAMETER WELLS
    FRYZ, IM
    IVANIV, MI
    DEINEKA, IV
    GAIOVYI, MS
    LISHCHUK, VY
    STARKOV, AA
    NEFTYANOE KHOZYAISTVO, 1989, (03): : 66 - 67
  • [4] NUMERICAL ANALYSIS OF THE BEHAVIOUR OF A LARGE-DIAMETER MONOPILE FOR OFFSHORE WIND TURBINES
    Ahlinhan, Marx Ferdinand
    Adjovi, Edmond Codjo
    Doko, Valery
    Tigri, Herbert Nelson
    ACTA GEOTECHNICA SLOVENICA, 2019, 16 (01): : 53 - 69
  • [5] Premature refusal of large-diameter, deep-penetration piles on an offshore platform
    Li Sa
    Tian Yinghui
    Zhou Yangrui
    Jiang Baofan
    Wang Jinbiao
    APPLIED OCEAN RESEARCH, 2013, 42 : 55 - 59
  • [6] HYDRODYNAMIC MODELING OF LARGE-DIAMETER BOTTOM-FIXED OFFSHORE WIND TURBINES
    Bachynski, Erin E.
    Ormberg, Harald
    PROCEEDINGS OF THE ASME 34TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2015, VOL 9, 2015,
  • [7] A hypoplastic macroelement model for offshore wind turbine large-diameter monopiles in sand
    Meng, Xiaowei
    Zhai, Endi
    Xu, Chengshun
    OCEAN ENGINEERING, 2024, 294
  • [8] Large-diameter Ironless Permanent Magnet Generator for Offshore Wind Power Application
    Zhang, Z.
    Matveev, A.
    Nilssen, R.
    Nysveen, A.
    2012 XXTH INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES (ICEM), 2012, : 684 - 690
  • [9] DRILLING LARGE-DIAMETER INCLINED BLAST HOLES
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 1988, 189 (01): : 56 - 57
  • [10] USE OF FOAMS IN THE DRILLING OF LARGE-DIAMETER WELLS
    MAZUR, VP
    DEVLEKANOV, AA
    NEFTYANOE KHOZYAISTVO, 1989, (07): : 75 - 77