Enhancing Reliability of Construction Contingency Estimation at the Scoping Phase through Historical Cost Data Analysis

被引:0
|
作者
Ko, Taewoo [1 ]
Le, Chau [2 ]
Jeong, H. David [3 ]
Choi, Kunhee [3 ]
机构
[1] Texas A&M Univ Commerce, Dept Engn & Technol, Commerce, TX 75428 USA
[2] Univ North Carolina Charlotte, Dept Engn Technol & Construct Management, Charlotte, NC 28223 USA
[3] Texas A&M Univ, Dept Construct Sci, College Stn, TX 77843 USA
关键词
PROJECTS; MODEL; MANAGEMENT; BUDGET;
D O I
10.1061/AJRUA6.RUENG-1260
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Accurate estimates of construction contingency, a vital element that accounts for unforeseen additional expenses during building, are crucial for construction project agencies. In the initial planning phase, with project specifics still under development, the top-down method is a popular approach for estimating contingency. This method employs a straightforward approach to calculating contingency, using a fixed percentage or a sliding scale based on project variables. While such a method offers simplicity, it suffers from constraints, notably the absence of rigorous evaluation and the challenges of considering project-specific risks. Hence, this research conducts a comprehensive analysis of historical highway project cost performance data to refine the applicability of the sliding scale methodologies and strengthen current top-down approaches. Using various statistical methods, the study creates probability distribution curves that show the likelihood of different contingency costs occurring, along with their associated confidence levels. These probability distribution curves provide cost estimators and project managers with a reliable way to improve the accuracy of early cost estimates during critical planning phases. This study will benefit project agencies by providing a more accurate and informed approach to budgeting and contingency management, thereby improving project cost reliability.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] The computer-based contingency estimation through analysis cost overrun risk of public construction project
    Jung, Ji Hyun
    Kim, Dae Young
    Lee, Hak Ki
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (04) : 1119 - 1130
  • [2] The computer-based contingency estimation through analysis cost overrun risk of public construction project
    Ji Hyun Jung
    Dae Young Kim
    Hak Ki Lee
    KSCE Journal of Civil Engineering, 2016, 20 : 1119 - 1130
  • [3] Estimation of Cost Contingency for Air Force Construction Projects
    Thal, Alfred E., Jr.
    Cook, Jason J.
    White, Edward D., III
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (11): : 1181 - 1188
  • [4] Cost Contingency and Cost Evolvement of Construction Projects in the Preconstruction Phase
    Hoseini, Erfan
    Bosch-Rekveldt, Marian
    Hertogh, Marcel
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (06)
  • [5] Cost contingency estimation: a new method for quantitative risk analysis applied to a real construction project
    Curto, David
    Poza, David
    Villafanez, Felix
    Acebes, Fernando
    DYNA, 2024, 99 (01): : 106 - 112
  • [6] A cost estimation recommendation system for improved contingency management in construction projects
    Fatemeh Mostofi
    Vedat Toğan
    Onur Behzat Tokdemir
    Yusuf Arayici
    Neural Computing and Applications, 2025, 37 (5) : 3521 - 3538
  • [7] Owner Time and Cost Contingency Estimation for Building Construction Projects in Egypt
    Nawar, Seif
    Hosny, Ossama
    Nassar, Khaled
    CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 367 - 377
  • [8] Historical pipeline construction cost analysis
    Rui, Zhenhua
    Metz, Paul A.
    Reynolds, Doug B.
    Chen, Gang
    Zhou, Xiyu
    INTERNATIONAL JOURNAL OF OIL GAS AND COAL TECHNOLOGY, 2011, 4 (03) : 244 - 263
  • [9] Use of historical data in software cost estimation
    Vijayakumar, S
    COMPUTING & CONTROL ENGINEERING JOURNAL, 1997, 8 (03): : 113 - 119
  • [10] Use of historical data in software cost estimation
    Vijayakumar, S.
    Computing and Control Engineering Journal, 1997, 8 (03): : 113 - 119