Numerical Analysis of Friction Reduction of Grouting in Long-Distance Pipe Jacking

被引:0
|
作者
Wu, Kai [1 ]
Mu, Linlong [2 ,3 ]
Hu, Longhao [2 ,3 ]
Zhang, Linni [2 ,3 ]
机构
[1] Power China Fujian Elect Power Engn Co Ltd, Fuzhou 350003, Peoples R China
[2] Tongji Univ, State Key Lab Disaster Reduct Civil Engn, Shanghai 200092, Peoples R China
[3] Tongji Univ, Dept Geotech Engn, Shanghai 200092, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2025年 / 15卷 / 04期
基金
中国国家自然科学基金;
关键词
long-distance pipe jacking; grouting friction reduction; jacking force; interface reduction coefficient;
D O I
10.3390/app15041782
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
During pipe jacking construction, in addition to overcoming the resistance at the front, there is also the need to overcome significant frictional resistance. Grouting technology is commonly used in engineering to reduce the frictional resistance exerted on the pipe's external surface during the jacking process. This paper first reviews the commonly used grouting materials and processes, summarizes their mechanisms for friction reduction, and then establishes a numerical analysis model for grouting in pipe jacking, enhancing the common theoretical methods based on simulation results. The study employs different interface reduction coefficients to simulate the different effects of friction reduction by grouting, focuses on the impact of grouting on friction reduction during long pipe jacking, and compares the results with those calculated using common methods. The results show that the frictional resistance around the pipe is the main source of jacking force in long-distance pipe jacking, and the jacking force increases approximately linearly with the interface reduction coefficient.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Study on the pipe friction resistance in long-distance rock pipe jacking engineering
    Chen, Peng
    Liu, Xinrong
    Deng, Zhiyun
    Liang, Ninghui
    Du, Libing
    Du, Han
    Huang, Yedi
    Deng, Lingyun
    Yang, Gaoyang
    UNDERGROUND SPACE, 2023, 9 : 173 - 185
  • [2] Analysis and application of friction calculation model for long-distance rock pipe jacking engineering
    Deng, Zhiyun
    Liang, Ninghui
    Liu, Xinrong
    de la Fuente, Albert
    Lin, Peng
    Peng, Haoyang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 115
  • [3] Challenges in a Long-distance Pipe Jacking and Solutions in China
    Hui, Liu
    MATERIALS ENGINEERING FOR ADVANCED TECHNOLOGIES, PTS 1 AND 2, 2011, 480-481 : 1260 - 1265
  • [4] Monitoring and Analysis of Circumferential Pressure for Long-Distance Pipe Jacking Construction in Composite Strata
    Zhao, Yunfei
    Luo, Feilun
    Xiong, Liang
    ENGINEERING REPORTS, 2025, 7 (01)
  • [5] Automatic Guidance System for Long-Distance Curved Pipe-Jacking
    Guorong Pan
    Wei Fan
    KSCE Journal of Civil Engineering, 2020, 24 : 2505 - 2518
  • [6] Automatic Guidance System for Long-Distance Curved Pipe-Jacking
    Pan, Guorong
    Fan, Wei
    KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (08) : 2505 - 2518
  • [7] Monitoring and Analysis of Long Distance Pipe Jacking Construction
    Peng, Yan
    Gao, Haiquan
    Deng, Wenjie
    2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 891 - 898
  • [8] Long distance pipe jacking in Asia
    Tunn. Tunn. Int., 7 (40-42):
  • [9] Research on the Slurry for Long-Distance Large-Diameter Pipe Jacking in Expansive Soil
    Yang, Xian
    Liu, Yang
    Yang, Chao
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [10] Method for calculating frictional resistance of long-distance pipe jacking in deeply buried rock strata
    Zhong, Zu-Liang
    Diao, Xiao-Jun
    Liu, Xin-Rong
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2022, 44 (11): : 2063 - 2070