Efficiency improvement of flue gas cleaning plants use of adipic acid in lignite-fired power plant Frimmersdorf of RWE energie Ag

被引:0
|
作者
Hoffmann, W. [1 ]
Krug, Marion [1 ]
Schütz, M. [1 ]
机构
[1] RWE Power AG, Essen, Germany
来源
VGB PowerTech | 2001年 / 81卷 / 05期
关键词
Adsorbents - Carbon dioxide - Energy efficiency - Flue gases - Lignite - Sulfur dioxide;
D O I
暂无
中图分类号
学科分类号
摘要
The further improvement of desulphurization plants is an important task not only with a view to procedure technology but also economically. The aim of the optimization is mainly the adaptation of FGD plants to changing lignite qualities, the safe adherence to the required gypsum qualities and the reduction of the energy requirement (operating costs). Findings were compiled from many studies that, among others, concern the effects of adipic acid addition on the adsorbent, the retention behaviour and the gypsum produced. On the basis of this experience, the use of adipic acid was also tested in the FGD facilities of the Frimmersdorf power plant.
引用
收藏
页码:112 / 116
相关论文
共 11 条
  • [1] Steel structures in flue-gas desulphurization systems of RWE lignite-fired power stations
    Langeneke, B.
    Klusmann, H.
    Bauingenieur Berlin, 1987, 62 (02): : 61 - 65
  • [2] Life cycle considerations of the flue gas desulphurization system at a lignite-fired power plant in Thailand
    Sate Sampattagul
    Seizo Kato
    Tanongkiat Kiatsiriroat
    Anugerah Widiyanto
    The International Journal of Life Cycle Assessment, 2004, 9 : 387 - 393
  • [3] Life cycle considerations of the flue gas desulphurization system at a lignite-fired power plant in Thailand
    Sampattagul, S
    Kato, S
    Kiatsiriroat, T
    Widiyanto, A
    INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2004, 9 (06): : 387 - 393
  • [4] Improvement of conventional design of lignite-fired thermal power plant by integrating steam-air preheater and flue gas dryer
    Chantasiriwan, Somchart
    ENERGY CONVERSION AND MANAGEMENT-X, 2022, 15
  • [5] Techno-economic analysis of the lignite-fired power plant integrated with a steam or flue gas dryer
    Liu, Rongtang
    Liu, Ming
    Yan, Junjie
    DRYING TECHNOLOGY, 2021, 39 (10) : 1271 - 1284
  • [6] A novel lignite pre-drying system integrated with flue gas waste heat recovery at lignite-fired power plants
    Yan, Min
    Ma, Chunyuan
    Shen, Qiuwan
    Song, Zhanlong
    Chang, Jingcai
    APPLIED THERMAL ENGINEERING, 2019, 150 : 200 - 209
  • [7] Efficiency and power upgrade at the aged lignite-fired power plant by flue gas waste heat utilization: High pressure versus low pressure economizer installation
    Stevanovic, Vladimir D.
    Petrovic, Milan M.
    Wala, Tadeusz
    Milivojevic, Sanja
    Ilic, Milica
    Muszynski, Slawomir
    ENERGY, 2019, 187
  • [8] Adsorptive waste gas cleaning during the co-combustion of sewage sludge in a lignite-fired industrial power plant
    Wirling, J.
    Schiffer, H.-P.
    Merzbach, F.
    VGB PowerTech, 2000, 80 (12): : 59 - 62
  • [9] Improved Lignite Predrying System Integrated with Heat and Water Recovery from Wet Flue Gas at Lignite-Fired Power Plants: Energy and Water Conservation
    Yan, Min
    Ma, Yang
    Li, Minqiang
    Hu, Dejun
    Ma, Chunyuan
    JOURNAL OF ENERGY ENGINEERING, 2022, 148 (01)
  • [10] Pilot Study on In-Depth Water Saving and Heat Recovery from Tail Flue Gas in Lignite-Fired Power Plant
    Xiong, Yingying
    Niu, Yanqing
    Wang, Xuebin
    Tan, Houzhang
    INTERNATIONAL CONFERENCE ON APPLIED ENERGY, ICAE2014, 2014, 61 : 2558 - 2561