共 50 条
- [1] 25 Years Railroad Power Supply and 45 Years Central Management of Railroad Power Supply. eb - Elektrische Bahnen, 1983, 81 (05): : 141 - 148
- [2] 25 Years Load Distribution Network Operation for a Reliable Railroad Power Supply. eb - Elektrische Bahnen, 1983, 81 (05): : 160 - 166
- [3] Central Substation Karlsruhe West Germany. A Milestone in the History of Railroad Power Supply. eb - Elektrische Bahnen, 1984, 82 (10): : 319 - 326
- [6] 50 Years TWS (Gas, Water and Power Supply System of the City of Stuttgart). Balance of Successful Cooperation with the West German Railroad System (DB) in the Field of Electric Power Supply. eb - Elektrische Bahnen, 1983, 81 (05): : 176 - 179
- [9] INTEGRAL, REMOVABLE POWER SUPPLY. IBM technical disclosure bulletin, 1983, 26 (06): : 2861 - 2862