HUNTERSTON A: FIRST SIXTEEN YEARS OF OPERATION.

被引:0
|
作者
Dominey, J.R.
Battle, T.A.
Leary, D.E.
Laing, D.
机构
来源
Nuclear Energy | 1981年 / 20卷 / 02期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
NUCLEAR POWER PLANTS
引用
收藏
页码:197 / 200
相关论文
共 50 条
  • [1] EXPERIENCES FROM THE FIRST YEARS OF OPERATION.
    Andersson, Olof
    Document - Swedish Council for Building Research, 1988, (09): : 1 - 57
  • [2] HUNTERSTON-A - 1ST 16 YEARS OF OPERATION
    DOMINEY, JR
    BATTLE, TA
    BROW, NJ
    LAING, D
    LEARY, DE
    NUCLEAR ENERGY-JOURNAL OF THE BRITISH NUCLEAR ENERGY SOCIETY, 1981, 20 (02): : 197 - 200
  • [3] VALFIL: THE FIRST MONTHS OF OPERATION.
    Thill, Andre
    Wire Journal International, 1982, 15 (09): : 104 - 107
  • [4] A major refurbishment project after 20 years operation at Hunterston B
    Grant, J
    Fischer, MJ
    Petty, DJ
    Eden, NA
    Elliott, J
    FIRST IEE/IMECHE INTERNATIONAL CONFERENCE ON POWER STATION MAINTENANCE - PROFITABILITY THROUGH RELIABILITY, 1998, (452): : 196 - 207
  • [5] TEN YEARS OF FLUIDISED BED OPERATION.
    Whitworth, Keith
    Coal international Redhill, 1985, 4 (01): : 9 - 10
  • [6] Sixteen years of operation at the Cajamarquilla Zinc Refinery
    Málaga, MV
    Metcalfe, KA
    ZINC AND LEAD PROCESSING, 1998, : 649 - 662
  • [7] OXYGEN PLANTS: 10 YEARS OF DEVELOPMENT AND OPERATION.
    Wolff, F.
    Eyre, D.V.
    Grenier, M.
    Chemical Engineering Progress, 1979, 75 (07): : 83 - 87
  • [9] LBE PROCESS: FIVE YEARS OF WORLDWIDE INDUSTRIAL OPERATION.
    Henrion, R.
    Schleimer, F.
    Denier, G.
    Roederer, Ch.
    Revue Technique Luxembourgeoise, 1986, 78 (03): : 120 - 128
  • [10] TWENTY YEARS OF HEALTH PHYSICS RESEARCH REACTOR OPERATION.
    Sims, C.S.
    Gilley, L.W.
    1600, (24):