HOLDING OF NODULAR IRON IN CHANNEL INDUCTION FURNACES.

被引:0
|
作者
Archenholtz, Ake
机构
关键词
CAST IRON - Nodular - IRON FOUNDRY PRACTICE;
D O I
暂无
中图分类号
学科分类号
摘要
Experiments have demonstrated that nodular iron can be held for 7 to 8 hours in an ASEA mains-frequency channel furnace compared to about 15 minutes under normal conditions. In addition, holding in a channel furnace results in improved flowability of the iron, reduced number of surface defects and better casting properties. At the same time, a large amount of treated nodular iron will be available when it is desired to pour, for example, heavy castings.
引用
收藏
页码:88 / 90
相关论文
共 50 条