PLANNING MODEL AND ITS APPLICATION TO OPTIMIZATION OF THE PARAMETERS FOR HYDROPOWER STATIONS.

被引:0
|
作者
Shi, Xican [1 ]
Xu, Qing [1 ]
机构
[1] Tsinghua Univ, China, Tsinghua Univ, China
来源
Shuili Xuebao | 1987年 / 09期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
9
引用
收藏
页码:1 / 8
相关论文
共 50 条
  • [1] Iron concrete penstock for hydropower stations.
    不详
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1924, 68 : 797 - 797
  • [2] MODEL AND SOLUTIONS FOR OPTIMUM WORKING DEPTHS OF A SERIES OF HYDROPOWER STATIONS.
    Chen, Shouyu
    Shuili Xuebao, 1987, (05): : 1 - 8
  • [3] EXPLOITING SEASONAL ENERGY FROM SMALL HYDROPOWER STATIONS.
    Li Ying
    1600, (37):
  • [4] Planning and Erection of Main Control Stations.
    Tietze, Ernst Guenther
    Watzlaw, Karl Heinz
    Elektrizitatswirtschaft, 1981, 80 (22): : 814 - 826
  • [5] SIMULATION AND OPTIMIZATION OF A SERIES OF HYDRO STATIONS.
    Dondi, P.H.
    Schaffer, G.
    International Water Power and Dam Construction, 1983, 35 (11): : 20 - 23
  • [6] APPLICATION OF SYNCHRONOUS MOTORS TO GENERATING STATIONS.
    Lakhavani, S.T.
    Research and Development Report - Canadian Electrical Association, 1983,
  • [7] MAIN HYDROPOWER EQUIPMENT OF THE FIRST SERIES OF PUMPED-STORAGE STATIONS.
    Krasil'nikov, M.F.
    Hydrotechnical Construction, 1985, 19 (04): : 167 - 174
  • [8] Improved quantum-behaved particle swarm optimization and its application in optimal operation of hydropower stations
    Feng, Zhongkai
    Liao, Shengli
    Niu, Wenjing
    Shen, Jianjian
    Cheng, Chuntian
    Li, Zehong
    Shuikexue Jinzhan/Advances in Water Science, 2015, 26 (03): : 413 - 422
  • [9] Runoff forecast uncertainty considered load adjustment model of cascade hydropower stations and its application
    Jiang, Zhiqiang
    Li, Rongbo
    Li, Anqiang
    Ji, Changming
    ENERGY, 2018, 158 : 693 - 708
  • [10] Application of URSADAT 4190 System in Transformer Stations.
    Richter, Guenter
    Energietechnik, 1979, 29 (01): : 18 - 22