BRIDGE DECK REHAB ZIPS ALONG WITH HIGH-PRESSURE WATER JET.

被引:0
|
作者
Anon
机构
来源
Highway & heavy construction | 1986年 / 129卷 / 08期
关键词
ROBOT APPLICATIONS;
D O I
暂无
中图分类号
TU [建筑科学]; U [交通运输];
学科分类号
08 ; 0813 ; 0823 ;
摘要
Hydro-demolition was used for fast and efficient bridge deck rehabilitation in East St. Louis, Ill. 3,500 cu. yd. of deck were cleared of deteriorated concrete, repaved and completed in about four weeks. The hydro-demolition technique is called the Conjet concrete removal system. A RotoMill robot was used to cut the concrete deck with a water jet.
引用
收藏
页码:46 / 47
相关论文
共 50 条