共 50 条
- [1] On using Monte Carlo methods for scheduling PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2004, : 1870 - 1875
- [3] Two improvements in risk analysis for project cost using Monte Carlo methods NEW TRENDS OF INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN NEW CENTURY, 2001, : 679 - 683
- [6] On the assessment of economic risk: factorial design versus Monte Carlo methods Reliab Eng Syst Saf, 1 (91-102):
- [8] Monte Carlo Simulation for Project Risk Prioritisation PROCEEDINGS OF THE 17TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND INDUSTRIAL MANAGEMENT, ICIEIM-XXVII CONGRESO DE INGENIERIA DE ORGANIZACION, CIO 2023, 2024, 206 : 455 - 460
- [10] INTRODUCTION TO FINANCIAL RISK ASSESSMENT USING MONTE CARLO SIMULATION PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 99 - +