共 50 条
- [1] CONSTRUCTION OF LONG KEY BRIDGE JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1980, 25 (06): : 97 - 111
- [3] Material Properties of Bridge Deck Dedicated Interface Agent and Key Construction Techniques APPLIED ENERGY TECHNOLOGY, PTS 1 AND 2, 2013, 724-725 : 1514 - 1519
- [4] A New Precast Concrete Deck System for Accelerated Bridge Construction FACING THE CHALLENGES IN STRUCTURAL ENGINEERING, 2018, : 229 - 241
- [5] A New Precast Concrete Deck System for Accelerated Bridge Construction ADVANCES IN CIVIL ENGINEERING MATERIALS, 2018, 7 (03): : 303 - 327
- [6] Design and construction of open deck bridge TAILOR MADE CONCRETE STRUCTURES: NEW SOLUTIONS FOR OUR SOCIETY, 2008, : 162 - 162
- [8] Mix design for SFRC bridge deck construction FIFTH RILEM SYMPOSIUM ON FIBRE-REINFORCED CONCRETES (FRC), 2000, 15 : 119 - 128
- [9] Investigation of bridge deck deformation during construction 9TH INTERNATIONAL CONFERENCE: MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, VOLS 1-3, 2008, : 541 - 545
- [10] A new cyanohydrin synthesis with electrochemical procedures. ZEITSCHRIFT FUR ELEKTROCHEMIE, 1903, 9 : 83 - 85