PLANT EXPANSION BEGINS OPERATION BEFORE COMPLETION.

被引:0
|
作者
Battenfield, Teresa [1 ]
Thompson, William B. [1 ]
机构
[1] 69th Street Wastewater Treatment, Plant, Houston, TX, USA, 69th Street Wastewater Treatment Plant, Houston, TX, USA
来源
Public Works | 1987年 / 118卷 / 02期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:47 / 49
相关论文
共 50 条
  • [1] PLANNING. . . TO COMPLETION.
    Braye, Jim
    Process Engineering (London), 1985, 66 (03): : 47 - 48
  • [2] A PAUSE BEFORE THE REAL EXPANSION BEGINS
    不详
    FORTUNE, 1981, 103 (01) : 7 - &
  • [3] FIFE ETHYLENE: COUNTDOWN TO COMPLETION.
    Tayler, Clive
    Process Engineering (London), 1984, 65 (07):
  • [4] Greenfield lime plant begins operation
    World Cement, 1997, 28 (02):
  • [5] On a variational theory of image amodal completion.
    Masnou, Simon
    Morel, Jean-Michel
    RENDICONTI DEL SEMINARIO MATEMATICO DELLA UNIVERSITA DI PADOVA, 2006, 116 : 211 - 252
  • [6] NEW DEVELOPMENTS IN THERMAL WELL COMPLETION.
    Buyken, Klaus-Peter
    Goetzen, P.
    Oil Gas European Magazine, 1988, 14 (01): : 24 - 28
  • [7] Adaptive confidence sets for matrix completion.
    Carpentier, Alexandra
    Klopp, Olga
    Loeffler, Matthias
    Nickl, Richard
    BERNOULLI, 2018, 24 (4A) : 2429 - 2460
  • [8] Bottom Hole Designs During Well Completion.
    Ashraf'yan, M.O.
    Lebedev, O.A.
    Oil Industry, 1979, (06): : 27 - 31
  • [9] End of life care and MOLST completion.
    Olden, A.
    Quill, T.
    Ladwig, S.
    JOURNAL OF THE AMERICAN GERIATRICS SOCIETY, 2007, 55 (04) : S159 - S160
  • [10] Large Israeli desal plant begins operation
    Journal / American Water Works Association, 2006, 98 (01): : 52 - 53