共 7 条
- [3] APPLICATION OF THE ADVANCED CONSTRUCTION TECHNOLOGIES TO SHIMANE NUCLEAR POWER STATION UNIT NO.3 OF THE CHUGOKU ELECTRIC POWER CO., INC. PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 6, 2011, : 321 - 324
- [4] Operation results of IHI flue gas desulfurization system for unit 1(1,000MW) at Hitachinaka Power Station and unit 1 at Mizue Power Station Proceedings of the ASME Power Conference 2005, Pts A and B, 2005, : 831 - 837
- [5] Design and operation experience of most advanced combined cycle plant - construction of Unit No.4-1 Higashi Niigata Thermal Power Station of Tohoku Electric Power Co., Inc. Technical Review - Mitsubishi Heavy Industries, 2000, 37 (03): : 69 - 73
- [7] 1ST OPERATIONAL RESULTS FROM THE SCR-DEMONSTRATION PLANT INSTALLED AFTER THE FLUE-GAS DESULFURIZATION PLANT IN THE COMBINED-HEAT-AND-POWER-STATION-HAFEN, UNIT-2 BRENNSTOFF-WARME-KRAFT, 1988, 40 (05): : 193 - 198