共 50 条
- [4] AIR FLOW SYNCHRONIZATION CONTROLS IN VAV SYSTEMS. HPAC Heating, Piping, Air Conditioning, 1981, 53 (08): : 47 - 53
- [5] Transient Calculation Method for Variable Air Volume Systems. Klima, Kalte, Heizung, 1987, 15 (03): : 155 - 160
- [7] Gas Burner Control and Monitoring Systems. Gas Waerme International, 1979, 28 (2-3): : 128 - 131
- [8] The Effect of Inlet Air Preheat on CO and NO Production in the Combustion of Diesel in Canister Burner JURNAL TEKNOLOGI, 2014, 71 (02):
- [9] REDUCING ENERGY COSTS WITH VARIABLE AIR VOLUME HVAC SYSTEMS. Plant Engineering (Barrington, Illinois), 1977, 31 (02): : 137 - 139
- [10] Burner design for flameless oxidation with low NO-formation even at maximum air preheat Industrial Heating, 1995, 62 (01): : 24 - 28