共 50 条
- [1] FINE BUBBLE AERATION - CONSIDERATIONS IN DESIGN AND OPERATION WATER-ENGINEERING & MANAGEMENT, 1988, 135 (08): : 30 - 34
- [3] Considerations on the Safety of Railway Operation. Ingegneria Ferroviaria, 1981, 36 (12): : 831 - 840
- [7] Practical considerations in aseptic filling operation. ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1997, 213 : 292 - BIOT