RECOVERING GOLD FROM TAILINGS DAMS.

被引:0
|
作者
Hollaway, John [1 ]
机构
[1] John Hollaway & Associates (Pvt), Ltd, Harare, Zimbabwe, John Hollaway & Associates (Pvt) Ltd, Harare, Zimbabwe
来源
| 1600年 / 152期
关键词
CARBON IN PULP - TAILINGS DISPOSAL;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] DESIGN AND CONSTRUCTION OF TAILINGS DAMS.
    Klohn, Earle J.
    1972, 65 (720): : 28 - 44
  • [2] SKY EYE MONITORS TAILINGS DAMS.
    Roth, L.H.
    Cesare, J.A.
    Allison, G.S.
    Coal Age, 1977, 82 (08): : 58 - 62
  • [3] RISK ANALYSIS FOR SEISMIC DESIGN OF TAILINGS DAMS.
    Vick, Steven G.
    Atkinson, Gail M.
    Wilmot, Charles I.
    Journal of Geotechnical Engineering, 1985, 111 (07): : 916 - 933
  • [4] DYNAMIC EFFECTS IN WASTE DUMPS AND TAILINGS DAMS.
    Forbes, P.J.
    Transactions of the Institution of Mining and Metallurgy, Section A: Mining Technology, 1984, 93 : 197 - 202
  • [5] ABATEMENT OF POLLUTION FROM ABANDONED GOLD-RESIDUE DAMS.
    Blight, G.E.
    Caldwell, J.A.
    1600, (84):
  • [6] EROSION LOSSES FROM THE SURFACES OF GOLD-TAILINGS DAMS
    BLIGHT, GE
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1989, 89 (01): : 23 - 29
  • [7] Harmony looks at additional gold recovery from tailings dams
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 2008, 209 (02): : 22 - 22
  • [8] Application of coal gold agglomeration process to gold recovering from amalgamation tailings
    Zhao, B
    Lu, LZ
    Xie, HQ
    TRANSACTIONS OF NONFERROUS METALS SOCIETY OF CHINA, 1997, 7 (04) : 152 - 155
  • [10] Variations in composition on SA gold tailings dams
    Vermeulen, NJ
    Rust, E
    Clayton, CRI
    TAILINGS AND MINE WASTE '02, 2002, : 45 - 52