Long-term peak electricity load forecasting in Taiwan: A cointegration analysis

被引:0
|
作者
Chung-Hua Inst for Economic Research, Taipei, Taiwan [1 ]
机构
来源
Pac Asian J Energy | / 1卷 / [d]63-74期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Long-term load forecasting in electricity market
    Daneshi, Hossein
    Shahidehpour, Mohammad
    Choobbari, Azim Lotfjou
    2008 IEEE INTERNATIONAL CONFERENCE ON ELECTRO/INFORMATION TECHNOLOGY, 2008, : 395 - 400
  • [2] Density Forecasting for Long-Term Peak Electricity Demand
    Hyndman, Rob J.
    Fan, Shu
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2010, 25 (02) : 1142 - 1153
  • [3] A New Approach for Long-Term Electricity Load Forecasting
    Safdarian, Amir
    Fotuhi-Firuzabad, Mahmud
    Lehtonen, Matti
    Aghazadeh, Milad
    Ozdemir, Aydogan
    2013 8TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONICS ENGINEERING (ELECO), 2013, : 122 - 126
  • [4] An adaptive backpropagation algorithm for long-term electricity load forecasting
    Nooriya A. Mohammed
    Ammar Al-Bazi
    Neural Computing and Applications, 2022, 34 : 477 - 491
  • [5] Long-term electricity load forecasting: Current and future trends
    Lindberg, K. B.
    Seljom, P.
    Madsen, H.
    Fischer, D.
    Korpas, M.
    UTILITIES POLICY, 2019, 58 : 102 - 119
  • [6] An adaptive backpropagation algorithm for long-term electricity load forecasting
    Mohammed, Nooriya A.
    Al-Bazi, Ammar
    NEURAL COMPUTING & APPLICATIONS, 2022, 34 (01): : 477 - 491
  • [7] Research on Intelligent Forecasting Method of Medium and Long-term Electricity Load
    Wang Deji
    Lian Jie
    Xie Junming
    PROCEEDINGS OF THE 31ST CHINESE CONTROL CONFERENCE, 2012, : 3928 - 3931
  • [9] Forecasting the long-term electricity demand in Taiwan with a hybrid FLR and BPN approach
    Chen, T. (tolychen@ms37.hinet.net), 1600, Chinese Fuzzy Systems Association (14):
  • [10] The Study of Long-term Electricity Load Forecasting Based on Improved Grey Prediction
    Wang, Hong
    Yang, Kun
    Xue, Lin-yan
    Liu, Shuang
    PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2014, 2015, : 441 - 444