RULE OF THUMB ESTIMATES OPTIMUM TIME TO KEEP CONSTRUCTION EQUIPMENT.

被引:0
|
作者
Green, R.D. [1 ]
机构
[1] Univ of Pennsylvania, Energy Cent,, Philadelphia, PA, USA, Univ of Pennsylvania, Energy Cent, Philadelphia, PA, USA
来源
Pipe line industry Houston, Tex. | 1985年 / 63卷 / 02期
关键词
COMPUTER PROGRAMS - CONSTRUCTION EQUIPMENT - Depreciation;
D O I
暂无
中图分类号
学科分类号
摘要
Construction firm executives prefer cost-wise decisions concerning whether and when equipment will be replaced. The problem is extensive since equipment spreads are both extensive and varied. Equipment needed to construct a pipe line deteriorates with use, and maintenance costs rise over time. These maintenance costs might include, among other things, (1) funds for a preventive maintenance program; (2) funds to be set aside for costs incurred due to equipment failures; (3) replacement parts, and (4) labor expenses for repairs. The problem of how to decide when to replace equipment is simplified with a 'life cycle analysis' which compares (over an infinite time horizon) any number of alternatives of maintaining or replacing machines and then identifies the optimum choice. A 'rule of thumb' approach to life cycle analysis for construction equipment can be performed by making some assumptions to simplify the usually complex calculations. A Hewlett Packard HP41-CV computation estimates the optimum retention period for construction equipment.
引用
收藏
页码:46 / 47
相关论文
共 50 条
  • [1] Construction Machinery and Equipment.
    Anon
    1600, (96):
  • [2] OPTIMUM OPERATION OF MINE DRAINAGE EQUIPMENT.
    Anon
    Coal Science and Technology (Peking), 1981, (03): : 42 - 46
  • [3] SEARCH FOR OPTIMUM ENGINEERING IN MINING EQUIPMENT.
    Kenny, P.
    Crellin, L.
    Mining Engineer London, 1986, 146 (298): : 15 - 17
  • [4] RULE OF THUMB SPEEDS PAYROLL ESTIMATES
    GREEN, RD
    PIPE LINE INDUSTRY, 1985, 62 (03): : 52 - 54
  • [5] SPECIFICATION FOR WELDING EARTHMOVING AND CONSTRUCTION EQUIPMENT.
    Anon
    1978, (AWS D14. 3-77):
  • [6] CONSTRUCTION OF ECONOMICAL LININGS OF PRODUCTION EQUIPMENT.
    Abbakumov, V.G.
    Tsibin, I.P.
    Novikov, V.L.
    Refractories (English translation of Ogneupory), 1987, 28 (9-10): : 593 - 599
  • [7] COLD WEATHER TIPS FOR CONSTRUCTION EQUIPMENT.
    Anon
    Public Works, 1988, 119 (08):
  • [8] DEVELOPMENT OF CONSTRUCTION PRACTICE FOR TRANSMISSION EQUIPMENT: TYPE 9 EQUIPMENT.
    Petit, A.
    Cadre, M.
    Mercier, G.
    Raynaud, J.
    Commutation and Transmission, 1988, 10 (03): : 53 - 60
  • [9] RULE OF THUMB SPEEDS PAYROLL ESTIMATES.
    Green, R.D.
    Pipe line industry Houston, Tex., 1985, 62 (03): : 52 - 54
  • [10] Use of Plastics in the Construction of Chemical Process Equipment.
    Nestler, Walter
    Plastverarbeiter, 1981, 32 (10): : 1379 - 1381