Switches on slab track

被引:0
|
作者
Dubsky, Wolfgang
机构
来源
Eisenbahningenieur | 1995年 / 46卷 / 06期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Long-term investigations of switches on non-ballasted slab track
    Berg, Günter
    Anker, Torsten
    Dehne, Stefan
    ZEV Rail Glasers Annalen, 2004, 128 (03): : 84 - 97
  • [2] Prefabricated turnout system LRB TS - Slab track for switches Bögl at Saalburgstrasse, Frankfurt, Germany
    Bögl, Stefan
    ZEVrail, 2009, 133 (11-12): : 444 - 445
  • [3] Crailsheim slab track
    Wolf, Guenther
    Eisenbahningenieur, 1999, 50 (01): : 32 - 34
  • [4] Bogl slab track
    Holzinger, Hans
    Schreiner, Ulrike
    Eisenbahningenieur, 2000, 51 (09): : 74 - 78
  • [5] Slab track/surveying
    Voelter, Ulrich
    Eisenbahningenieur, 1997, 48 (04):
  • [6] Slab track testing on CP
    陈樾荫
    铁道建筑, 1986, (07) : 34 - 36
  • [7] QUALITY OF SLAB TRACK CONSTRUCTION - TRACK ALIGNMENT DESIGN AND TRACK GEOMETRY
    Sestakova, Janka
    CIVIL AND ENVIRONMENTAL ENGINEERING, 2015, 11 (01) : 2 - 9
  • [8] On vehicle/track impact at connection between a floating slab and ballasted track and floating slab track's effectiveness of force isolation
    Li, Z. G.
    Wu, T. X.
    VEHICLE SYSTEM DYNAMICS, 2009, 47 (05) : 513 - 531
  • [9] Failures of Rails and Track Switches.
    Augustin, Hubert
    Laizner, Hans
    Schossmann, Reinhard
    Berg- und Huettenmaennische Monatshefte, 1974, 119 (07): : 268 - 275
  • [10] Contact Loss Identification of the Interface Between Sleeper and Track Slab for Twin-Block Slab Track
    Xu X.
    Du W.
    Ren J.
    Du J.
    Luo L.
    Zhendong Ceshi Yu Zhenduan/Journal of Vibration, Measurement and Diagnosis, 2024, 44 (01): : 81 - 87and198