New heuristic for the flowshop scheduling problem in the presence of bottleneck machine. A performance study

被引:0
|
作者
Han, Wenxue
Dejax, Pierre
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] New scheduling heuristic for the permutation flowshop problem
    Beijing Univ of Aeronautics and, Astronautics, Beijing, China
    Beijing Hangkong Hangtian Daxue Xuebao, 1 (83-87):
  • [3] A shifting bottleneck approach for a parallel-machine flowshop scheduling problem
    Cheng, JL
    Karuno, Y
    Kise, H
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 2001, 44 (02) : 140 - 156
  • [4] Bottleneck-Based Heuristic for Permutation Flowshop Scheduling
    Isa, N. A.
    Bareduan, S. A.
    Zainudin, A. S.
    10TH INTERNATIONAL CONFERENCE ON MECHANICAL AND MANUFACTURING ENGINEERING (ICME2019), 2020, 824
  • [5] HEURISTIC ALGORITHM FOR FLOWSHOP SCHEDULING PROBLEM
    GUPTA, JND
    REVUE FRANCAISE D AUTOMATIQUE INFORMATIQUE RECHERCHE OPERATIONNELLE, 1976, 10 (06): : 63 - 73
  • [6] A Heuristic Algorithm for Flowshop Scheduling Problem
    Tang, Dan
    Shu, Hong Ping
    MANUFACTURING ENGINEERING AND AUTOMATION II, PTS 1-3, 2012, 591-593 : 626 - 630
  • [7] A Heuristic Algorithm for the Two-Machine Flowshop Group Scheduling Problem
    Wang Xiuli & Wu Tihua Department of Automation
    JournalofSystemsEngineeringandElectronics, 2002, (03) : 8 - 16
  • [8] Heuristic algorithm for the two-machine flowshop group scheduling problem
    Wang, Xiuli
    Wu, Tihua
    Journal of Systems Engineering and Electronics, 2002, 13 (03) : 8 - 16
  • [9] New VNS heuristic for total flowtime flowshop scheduling problem
    Costa, Wagner Emanoel
    Goldbarg, Marco Cesar
    Goldbarg, Elizabeth G.
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (09) : 8149 - 8161
  • [10] A New Constructive Heuristic for the No-Wait Flowshop Scheduling Problem
    Mousin, Lucien
    Kessaci, Marie-Eleonore
    Dhaenens, Clarisse
    LEARNING AND INTELLIGENT OPTIMIZATION (LION 11 2017), 2017, 10556 : 196 - 209