ELECTROSTATIC PRECIPITATOR PREVENTIVE MAINTENANCE.

被引:0
|
作者
Bibbo, P.P.
Peacos, M.M.
机构
来源
关键词
INDUSTRIAL PLANTS - Fume Control;
D O I
暂无
中图分类号
学科分类号
摘要
This article discusses aspects of recommended procedures that field service personnel find are most often misunderstood or neglected.
引用
收藏
页码:77 / 79
相关论文
共 50 条
  • [1] PREVENTIVE MAINTENANCE.
    Carrieri, Jim
    World mining, 1983, 36 (10): : 54 - 55
  • [2] PREVENTIVE MAINTENANCE.
    SEN, SALIL
    1982, V 16 (PT S 2): : 61 - 65
  • [3] DESIGN FOR PREVENTIVE MAINTENANCE.
    Moss, Marvin A.
    Machine Design, 1982, 54 (06) : 67 - 72
  • [4] ON THE ECONOMICS OF PREVENTIVE MAINTENANCE.
    Buck, James R.
    Deisenroth, Michael P.
    Terotechnica, 1980, 1 (04): : 293 - 301
  • [5] FUSION UNIT PREVENTIVE MAINTENANCE.
    Striplin, T.H.
    Pipeline and Gas Journal, 1986, 213 (07): : 28 - 35
  • [6] MANPOWER ESTIMATION FOR PREVENTIVE MAINTENANCE.
    Mukhopadhyay, S.K.
    Journal of the Institution of Engineers (India): Mechanical Engineering Division, 1985, 65 (pt 3-4): : 83 - 86
  • [7] ELECTROSTATIC PRECIPITATOR MAINTENANCE SURVEY
    BUMP, RL
    JOURNAL OF THE AIR POLLUTION CONTROL ASSOCIATION, 1976, 26 (11): : 1061 - 1064
  • [8] COST OPTIMIZATION OF PERIODIC PREVENTIVE MAINTENANCE.
    Canfield, R.V.
    IEEE Transactions on Reliability, 1986, R-35 (01) : 78 - 81
  • [9] METHODOLOGY FOR IDENTIFICATION OF CRITICAL EQUIPMENT FOR PREVENTIVE MAINTENANCE.
    Mukhopadhyay, S.K.
    Joshi, S.N.
    1600, (64):
  • [10] RELIABILITY/PERFORMANCE EVALUATION FOR A MULTISYSTEM WITH PREVENTIVE MAINTENANCE.
    Ohshimo, Hideshi
    Osaki, Shunji
    Microelectronics Reliability, 1985, 25 (05) : 841 - 846