共 50 条
- [1] A fuzzy logic model to predict the performance of hard rock tunnel boring machine UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1171 - 1178
- [3] Prediction of CMRS Rock mass rating using fuzzy logic 2015 INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTER ENGINEERING AND APPLICATIONS (ICACEA), 2015, : 13 - 17
- [4] Fuzzy Modeling Approaches for the Prediction of Machine Utilization in Hard Rock Tunnel Boring Machines CONFERENCE RECORD OF THE 2006 IEEE INDUSTRY APPLICATIONS CONFERENCE, FORTY-FIRST IAS ANNUAL MEETING, VOL 1-5, 2006, : 947 - 954
- [5] Predicting penetration rate of hard rock tunnel boring machine using fuzzy logic Bulletin of Engineering Geology and the Environment, 2014, 73 : 23 - 35
- [7] Performance Analysis of Tunnel Boring Machines for Rock Excavation APPLIED SCIENCES-BASEL, 2021, 11 (06):
- [8] Probabilistic estimation of the advancement rate of the Tunnel Boring Machines on the basis of rock mass characteristics Geomechanics and Geophysics for Geo-Energy and Geo-Resources, 2022, 8