Peaking power- combustion turbines and steam generators

被引:0
|
作者
JACKSON FR
PAVEL JT
KOVACIK JN
机构
来源
| 1971年 / 43卷 / 03期
关键词
ELECTRIC POWER SYSTEMS - GAS TURBINE POWER PLANTS;
D O I
暂无
中图分类号
学科分类号
摘要
What can be done when the boilers for old units are worn out and require extensive repairs while the remainder of the steam system and the turbine generator are in good condition. One company has found the solution to this problem by installing combustion turbine generators for peaking power and waste heat boilers to supply steam to the old steam turbine generators. The major equipment in this combined cycle is presented with a description of the controls.
引用
收藏
页码:17 / 26
相关论文
共 50 条