共 50 条
- [2] ANALYSIS OF A TWO UNIT STANDBY SYSTEM WITH CORRELATED FAILURE AND REPAIR AND RANDOM APPEARANCE AND DISAPPEARANCE OF REPAIRMAN JOURNAL OF RELIABILITY AND STATISTICAL STUDIES, 2010, 3 (01): : 53 - 61
- [3] Stochastic analysis of a two-unit cold standby system with maximum repair time and correlated failures and repairs J Qual Maint Eng, 3 (66-76):
- [4] A TWO-UNIT PARALLEL SYSTEM WITH DEPENDENT FAILURE RATES AND CORRELATED WORKING AND REST TIME OF REPAIRMAN INTERNATIONAL JOURNAL OF AGRICULTURAL AND STATISTICAL SCIENCES, 2012, 8 (01): : 145 - 155
- [5] Cost-benefit analysis of a two-unit standby system with post-repair, activation time and correlated failures and repairs Journal of Quality in Maintenance Engineering, 1997, 3 (01): : 55 - 63
- [6] A two dissimilar unit multi-component system with correlated failures and repairs MICROELECTRONICS AND RELIABILITY, 1997, 37 (05): : 845 - 849
- [7] A 2 UNIT SERIES SYSTEM WITH CORRELATED FAILURES AND REPAIRS MICROELECTRONICS AND RELIABILITY, 1993, 33 (14): : 2165 - 2169
- [9] PROFIT ANALYSIS OF THREE UNIT COLD STANDBY SYSTEM WITH CORRELATED FAILURES AND REPAIRS INTERNATIONAL JOURNAL OF AGRICULTURAL AND STATISTICAL SCIENCES, 2009, 5 (01): : 123 - 130
- [10] A 2 UNIT PRIORITY REDUNDANT SYSTEM WITH 3 MODES AND CORRELATED FAILURES AND REPAIRS MICROELECTRONICS AND RELIABILITY, 1992, 32 (10): : 1367 - 1372