Effective progress scheduling and control for construction projects

被引:0
|
作者
Tavakoli, Amir
机构
关键词
Civil Engineering--Project Management - Transportation--Construction - Contracts;
D O I
暂无
中图分类号
学科分类号
摘要
Guidelines for progress scheduling and control of department-of-transportation (DOT) construction projects are presented. The guidelines are based on best current practices and management techniques and are modified to reflect their on-site implementation and the practical aspects of daily field records. General guidelines are outlined and discussed in the following areas: (1) Progress scheduling (including the use of bar charts); (2) monitoring of progress (S-curves); (3) capturing of productivity rates and their utilization; (4) the feedback process; (5) settlement of claims and disputes through documentation; and (6) computer utilization and applications. The acquisition of pertinent details, the analysis of that data, and the utilization of it to effectively manage current and future projects are the results of the implementation of these guidelines. While the guidelines provide a framework for DOT and their most frequent types of construction, flexibility within the guidelines allows for expansion of construction project size and type and allows for increasing levels of application that comes with continued use.
引用
收藏
页码:87 / 98
相关论文
共 50 条
  • [1] Scheduling of Construction Projects
    Bozejko, Wojciech
    Wodecki, Mieczyslaw
    PROCEEDINGS OF THE 6TH EUROPEAN CONFERENCE ON MANAGEMENT LEADERSHIP AND GOVERNANCE, 2010, : 64 - 72
  • [2] Application of Earned Value Method to Progress Control of Construction projects
    Czemplik, Andrzej
    XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 424 - 428
  • [3] Construction scheduling and progress control using geographical information systems
    Poku, Stephen E.
    Arditi, David
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2006, 20 (05) : 351 - 360
  • [4] Least - cost scheduling of Construction Projects
    Faheem, Miriqbal
    Basha, Syed Saleem
    Kalam, M.A.
    International Journal of Earth Sciences and Engineering, 2010, 3 (05): : 753 - 761
  • [5] Identifying Effective Fugitive Dust Control Measures for Construction Projects in Korea
    Noh, Hyun-jun
    Lee, Seul-ki
    Yu, Jung-ho
    SUSTAINABILITY, 2018, 10 (04)
  • [6] Automating progress measurement of construction projects
    Zhang, Xiaonan
    Bakis, Nick
    Lukins, Timothy C.
    Ibrahim, Yahaya M.
    Wu, Song
    Kagioglou, Mike
    Aouad, Ghassan
    Kaka, Ammar P.
    Trucco, Emanuele
    AUTOMATION IN CONSTRUCTION, 2009, 18 (03) : 294 - 301
  • [7] CONTROL OF CONSTRUCTION PROJECTS
    DUBUC, P
    METRA, 1971, 10 (04): : 559 - 567
  • [8] SCHEDULING AND CONTROL OF LINEAR PROJECTS
    ELDIN, NN
    SENOUCI, AB
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1994, 21 (02) : 219 - 230
  • [9] PROGRESS-BASED CONSTRUCTION SCHEDULING
    PULTAR, M
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04): : 670 - 688
  • [10] CONSTRUCTION PROJECTS SCHEDULING USING GIS TOOLS
    Bansal, V. K.
    Pal, Mahesh
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2011, 11 (01) : 1 - 18