Coiled tubing milling and temporary plug and abandonment operations

被引:0
|
作者
Norsk Hydro, Norway [1 ]
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Isolation barriers with coiled tubing in plug-and-abandonment operations
    Thomson, Iain, 2018, Society of Petroleum Engineers (SPE) (70):
  • [2] Isolation barriers with coiled tubing in plug-and-abandonment operations
    1600, Society of Petroleum Engineers (SPE) (70):
  • [3] Coiled tubing friction reduction of plug milling in long horizontal well with vibratory tool
    Hu, Yongquan
    Zhao, Jin
    Zhao, Jinzhou
    Zhao, Chaoneng
    Wang, Qiang
    Zhao, Xing
    Zhang, Yan
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2019, 177 : 452 - 465
  • [4] COILED TUBING ... OPERATIONS AND SERVICES
    WELCH, JL
    STEPHENS, RK
    WORLD OIL, 1992, 213 (09) : 81 - &
  • [5] COILED TUBING - OPERATIONS AND SERVICES
    SASJAWORSKY, A
    WORLD OIL, 1991, 212 (12) : 71 - &
  • [6] COILED TUBING ... OPERATIONS AND SERVICES
    BLOUNT, CG
    WALKER, EJ
    WORLD OIL, 1992, 213 (05) : 89 - &
  • [7] Coiled tubing operations and services
    Blount, Curtis G.
    World Oil, 1993, 214 (05) : 53 - 55
  • [8] COILED TUBING - OPERATIONS AND SERVICES
    SASJAWORSKY, A
    WORLD OIL, 1991, 212 (11) : 41 - 47
  • [9] COILED TUBING ... OPERATIONS AND SERVICES
    SASJAWORSKY, A
    WORLD OIL, 1993, 214 (01) : 39 - 43
  • [10] COILED TUBING . . . OPERATIONS AND SERVICES
    SASJAWORSKY, A
    WORLD OIL, 1992, 213 (01) : 95 - 101