Computer aided production scheduling system for underground coal mines

被引:0
|
作者
机构
来源
Chengdu Kejidaxue Xuebao | / 6卷 / 403-406期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [2] Computer simulation of evacuation in underground coal mines
    Ji J.
    Zhang J.
    Chen J.
    Wu S.
    Mining Science and Technology, 2010, 20 (05): : 677 - 681
  • [3] Computer aided production scheduling
    Jelacic, D
    Greger, K
    Motik, D
    CURRENT ECONOMIC QUESTIONS IN FORESTRY AND WOOD INDUSTRY, 1998, : 169 - 172
  • [4] COMPUTER-AIDED MINE DESIGN AND PLANNING FOR UNDERGROUND MINES
    CHATTERJEE, PK
    SRIDHAR, CK
    CIM BULLETIN, 1986, 79 (893): : 55 - 60
  • [5] Computer aided design system for long range planning in open cut coal mines
    Zhang, YD
    Li, KM
    Zhang, RX
    Li, SG
    Hou, YJ
    Li, SD
    26TH PROCEEDINGS OF THE APPLICATIONS OF COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1996, : 243 - 247
  • [6] Production of methane from coalbeds and underground coal mines
    Harpalani, S
    MINE PLANNING AND EQUIPMENT SELECTION 2001, 2001, : 929 - 935
  • [7] Computer aided scheduling of repetitive production
    Klos, S
    Skolud, B
    Stanczyk, J
    KNOWLEDGE-BASED SOFTWARE ENGINEERING, 1998, 48 : 317 - 320
  • [9] The Research of Coal Mine Underground Rubber Tyred Vehicle Wireless Video Aided Scheduling System
    Guo, Xiucai
    Zhang, Boli
    INFORMATION TECHNOLOGY AND INTELLIGENT TRANSPORTATION SYSTEMS, VOL 1, 2017, 454 : 365 - 371
  • [10] DIMENSIONING SPECIFICS OF THE PRODUCTION CAPACITY OF UNDERGROUND COAL MINES IN SERBIA
    Vladimir, Todorovic
    Drazana, Tosic
    Jelena, Trivan
    ARCHIVES FOR TECHNICAL SCIENCES, 2020, (23): : 45 - 52