共 50 条
- [3] WARNING ABOUT CYCLIC LOT SCHEDULING WITH SEQUENCE DEPENDENT SET-UP TIMES. International Journal of Production Research, 1988, 26 (07): : 1281 - 1283
- [4] HYDRAULIC COPYING KEEPS UP WITH THE TIMES. Machinery and Production Engineering, 1979, 135 (3479): : 49 - 51
- [5] CONTROLLED TEEMING KEEPS UP WITH THE TIMES. Iron and steel international, 1982, 55 (06): : 323 - 325