The article shows from the point of view of an electricity supply undertaking as the builder, and later the operator, the problems which arise when tieing large power stations into the system. Using the example of the 1300 MW Unterweser power station those points are listed specially which, because the problems are due to their peripheral position in the German grid, must be studied in detail.