FREQUENCY CONTROL WITH KAPLAN TURBINES.

被引:0
|
作者
Regalado, J.A. [1 ]
机构
[1] Sulzer-Escher Wyss Ltd, Zurich, Switz, Sulzer-Escher Wyss Ltd, Zurich, Switz
来源
Power international | 1988年 / 34卷 / 394期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
16
引用
收藏
页码:80 / 84
相关论文
共 50 条
  • [1] Refurbishment of Kaplan and Francis Turbines.
    Nowotny, Georg
    Elektrizitatswirtschaft, 1987, 86 (24): : 1056 - 1060
  • [2] Optimum Hub Diameter for Kaplan Turbines.
    Anton, Ioan
    Revue Roumaine des Sciences Techniques, Serie de Metallurgie, 1972, 17 (03): : 443 - 460
  • [3] PROBLEMS OF RELIABILITY OF OIL HEADERS OF KAPLAN TURBINES.
    Gal'perin, M.I.
    Shriro, I.I.
    Hydrotechnical Construction, 1985, 19 (09): : 512 - 514
  • [4] SAFE OPERATION OF HYDROSTATION UNITS WITH KAPLAN TURBINES.
    Krivchenko, G.I.
    Kvyatkovskaya, E.V.
    Matveev, V.A.
    Leont'ev, A.I.
    Kosolapova, T.V.
    Hydrotechnical Construction, 1984, 18 (03): : 119 - 123
  • [5] MODEL TESTS FOR THE RELIEF OPERATION OF KAPLAN AND BULB TURBINES.
    Hoeller, H.K.
    Schaffluetzel, H.
    Miller, H.
    Escher Wyss News, 1974, 47 (02): : 3 - 12
  • [6] TURBINES.
    Brogan, J.L.
    Thur, G.M.
    Rossbach, R.J.
    Schnacke, A.W.
    Wesling, G.C.
    Castor, J.G.
    Davis, R.C.
    Riddle, B.C.
    White, D.J.
    Roberts, P.B.
    Compton, W.A.
    Wright, E.S.
    1600,
  • [7] CONTROL OF SALT DEPOSITION IN STEAM TURBINES.
    Singal, R.K.
    Electrical India, 1985, 25 (03): : 17 - 20
  • [8] Speed Control of Biaxial Gas Turbines.
    Bolte, W.
    Waerme, 1973, 79 (2-3): : 38 - 45
  • [9] Development of a Control System for Steam Turbines.
    Kosyak, Yu.F.
    Teploenergetika, 1981, (01): : 7 - 9
  • [10] Benefits of battery hybridization in hydraulic turbines. Wear and tear evaluation in a Kaplan prototype
    Valentin, David
    Presas, Alexandre
    Egusquiza, Monica
    Drommi, Jean-Louis
    Valero, Carme
    RENEWABLE ENERGY, 2022, 199 : 35 - 43