共 33 条
- [1] SCHEDULING ALGORITHMS FOR A 2-MACHINE FLEXIBLE MANUFACTURING SYSTEM INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1995, 7 (03): : 207 - 227
- [3] CONCURRENT ROUTING, SEQUENCING, AND SETUPS FOR A 2-MACHINE FLEXIBLE MANUFACTURING CELL IEEE JOURNAL OF ROBOTICS AND AUTOMATION, 1988, 4 (03): : 256 - 264
- [5] Manufacturing Flexible System Design: The GRAI Method. Revue generale de l'electricite Paris, 1988, (01): : 19 - 27
- [7] Scheduling method with the consideration of machine setup in flexible manufacturing systems 1997 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION - PROCEEDINGS, VOLS 1-4, 1997, : 2735 - 2740
- [8] Study of machine and robot scheduling rules in a flexible manufacturing system ISIM'2000: PROCEEDINGS OF THE FIFTH CHINA-JAPAN INTERNATIONAL SYMPOSIUM ON INDUSTRIAL MANAGEMENT, 2000, : 486 - 491
- [9] Scheduling flexible manufacturing system using Tabu Search method IEEE ICIT' 02: 2002 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY, VOLS I AND II, PROCEEDINGS, 2002, : 1043 - 1048
- [10] A MAXIMUM PRINCIPLE BASED COMBINED METHOD FOR SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM DISCRETE EVENT DYNAMIC SYSTEMS-THEORY AND APPLICATIONS, 1995, 5 (04): : 343 - 355