Time-Constrained Recovery of Contaminated Groundwater

被引:0
|
作者
Hudak, P. F.
机构
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] ON-BOARD ENERGY RECOVERY ASSISTANCE FOR TIME-CONSTRAINED DESCENTS
    Zammit, Brian
    Zammit-Mangion, David
    2014 IEEE/AIAA 33RD DIGITAL AVIONICS SYSTEMS CONFERENCE (DASC), 2014,
  • [2] TIME-CONSTRAINED AUTOMATA
    MERRITT, M
    MODUGNO, F
    TUTTLE, MR
    LECTURE NOTES IN COMPUTER SCIENCE, 1991, 527 : 408 - 423
  • [3] On-board energy recovery assistance for time-constrained descents
    1600, AIAA International, 12700 Sunrise Valley Drive, Suite 200Reston, VA, Virginia, Virginia 20191-5807, United States (55):
  • [4] On-Board Energy Recovery Assistance for Time-Constrained Descents
    Zammit, Brian
    Zammit-Mangion, David
    JOURNAL OF AIRCRAFT, 2018, 55 (03): : 918 - 928
  • [5] Time-constrained learning
    Freitas, Sergio
    Laber, Eduardo
    Lazera, Pedro
    Molinaro, Marco
    PATTERN RECOGNITION, 2023, 142
  • [6] Time-Constrained Photography
    Hasinoff, Samuel W.
    Kutulakos, Kiriakos N.
    Durand, Fredo
    Freeman, William T.
    2009 IEEE 12TH INTERNATIONAL CONFERENCE ON COMPUTER VISION (ICCV), 2009, : 333 - 340
  • [7] Time-constrained project scheduling
    Guldemond, T. A.
    Hurink, J. L.
    Paulus, J. J.
    Schutten, J. M. J.
    JOURNAL OF SCHEDULING, 2008, 11 (02) : 137 - 148
  • [8] An Introduction to Time-Constrained Automata
    Lemerre, Matthieu
    David, Vincent
    Aussagues, Christophe
    Vidal-Naquet, Guy
    ELECTRONIC PROCEEDINGS IN THEORETICAL COMPUTER SCIENCE, 2010, (38): : 83 - 98
  • [9] Time-constrained machine translation
    Toole, J
    Turcato, D
    Popowich, F
    Fass, D
    McFetridge, P
    MACHINE TRANSLATION AND THE INFORMATION SOUP, 1998, 1529 : 103 - 112
  • [10] Time-constrained project scheduling
    T. A. Guldemond
    J. L. Hurink
    J. J. Paulus
    J. M. J. Schutten
    Journal of Scheduling, 2008, 11 : 137 - 148