In response to a growing bridge problem, the Pennsylvania Department of Transportation has been developing a series of standardized plans to lower the design costs of short and medium-span bridges. The standard designs were selected on the basis of ease of construction, fabrication and erection, economy and proven performance. The standards consist of two parts: design sheets and construction sheets. The design sheets include general information - such as design criteria, examples and instructions - and a data assembly section. The construction sheets include detailed drawings for each superstructure and substructure type. The standard designs are expected to become more streamlined - and cheaper - as the process is computerized and digitized into a computer-aided design and drafting system.
引用
收藏
相关论文
共 50 条
  • [1] DRILLING RESEARCH: NEW BIT DESIGNS PROMISE LOWER DRILLING COSTS.
    Anon
    Mining Engineering (Littleton, Colorado), 1975, 27 (08): : 38 - 40
  • [2] TUNNEL LININGS: COMPARATIVE DESIGNS AND COSTS.
    von der Au
    Tunnels and Tunnelling, 1975, 7 (03): : 88 - 90
  • [3] COMPUTER PROGRAM RELATES PART DESIGNS TO COSTS.
    Poli, Corrado
    Divgi, Jiten
    1600, (43):
  • [4] DESIGN OF BRIDGE SUPERSTRUCTURE: HOW TO OPTIMIZE THE COSTS.
    Jaafari, Ali
    Britt, Robert J.
    Swann, Keith
    Institution of Engineers, Australia, Civil Engineering Transactions, 1985, CE27 (04): : 426 - 435
  • [5] DIE CASTINGS DELIVER HIGH PERFORMANCE AT LOWER COSTS.
    Bowe, Jim
    Modern Metals, 1982, 38 (02): : 36 - 44
  • [6] AGVs EXPEDITE WIP FLOW, LOWER HANDLING COSTS.
    Gould, Les
    1600, (42):
  • [7] GUNDRILLING - HIGH QUALITY WAY TO LOWER PRODUCTION COSTS.
    Arnold, Lewis B.
    Machine and tool blue book, 1983, 78 (05): : 83 - 85
  • [8] PLOTTERS ACHIEVE HIGH SPEEDS AND ACCURACIES FOR LOWER COSTS.
    Anon
    Engineering materials and design, 1988, 32 (02):
  • [9] 7-DAY WORKWEEK COULD LOWER COSTS.
    Sullivan, Allanna M.
    Coal age, 1980, 85 (02): : 122 - 136
  • [10] MAINTENANCE COSTS.
    Marinello, R.L.
    Plant Engineering (Barrington, Illinois), 1981, 35 (17): : 58 - 63