共 50 条
- [1] Design and construction of the high intake slope at Xiaolangdi COMPUTER METHODS AND ADVANCES IN GEOMECHANICS, VOL 3, 1997, : 1715 - 1720
- [2] Stability analysis for underground powerhouse and tunnels of Xiaolangdi Multipurpose Dam Project CHALLENGES FOR THE 21ST CENTURY, VOL. 2: COMMUNICATION TUNNELS/MISCELLANEOUS INCLUDING WATER TUNNELS/MECHANISED TUNNELLING, 1999, : 721 - 728
- [3] Monitoring and stability analysis of roadbed & high slope prior to highway construction PLOS ONE, 2024, 19 (06):
- [5] Analysis of slope stability for west project of side slope in XiaoLongtan opencast ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 728 - 733
- [7] Status of Aquatic Environment of Reservoir Area and Downstream during the Construction Period of the Yellow River Xiaolangdi Multipurpose Dam Project and Problem Analysis PROCEEDINGS OF THE 1ST INTERNATIONAL YELLOW RIVER FORUM ON RIVER BASIN MANAGEMENT, VOL III, 2003, : 436 - 441
- [8] Stability analysis of a high excavated slope Geotechnical Engineering for Disaster Mitigation and Rehabilitation, 2005, : 379 - 385
- [10] Slope Stability Analysis of High Rockfill Cofferdam Considered with its Construction and Working Processing ADVANCES IN HYDROLOGY AND HYDRAULIC ENGINEERING, PTS 1 AND 2, 2012, 212-213 : 922 - +