A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market

被引:0
|
作者
Chen Y. [1 ]
Wang H. [1 ]
Xu X. [1 ]
Hu Y. [2 ]
Yan Z. [1 ]
Zeng D. [3 ]
Feng K. [3 ]
机构
[1] Key Laboratory of Control of Power Transmission and Conversion of Ministry of Education, Shanghai Jiao Tong University, Shanghai
[2] Power Dispatching and Control Center, State Grid Shanghai Municipal Electric Power Company, Shanghai
[3] China Electric Power Research Institute (Nanjing Branch), Nanjing
关键词
ambiguity set; bi-level electricity market; distributionally robust optimization; two-stage economic dispatch; uncertainty of source-load;
D O I
10.16183/j.cnki.jsjtu.2022.121
中图分类号
学科分类号
摘要
To promote the optimal allocation of resources across the country, China is actively developing inter-provincial electricity transactions, and will gradually form an inter-provincial and intra-provincial electricity market operation mode. In this context, a two-stage day-ahead, and intraday economic dispatch framework considering inter-provincial and intra-provincial bi-level market coordinated operation is proposed. In the day-ahead dispatch stage, an inter-provincial and intra-provincial bi-level economic dispatch model is constructed. In the intraday dispatch stage, an economic dispatch model considering the forecast error of source-load is constructed. To further deal with the influence of the uncertainty of source-load forecast on economic dispatch, a two-stage day-ahead and intraday distributionally robust economic dispatch model and its solution method are proposed, realizing the economic dispatch under random scene ambiguity set. Finally, a multi-sending ends and multi-receiving ends interconnected test system is constructed using IEEE 39-bus and 118-bus systems. The effectiveness of the proposed model and method is verified by simulation. © 2023 Shanghai Jiao Tong University. All rights reserved.
引用
收藏
页码:1114 / 1125
页数:11
相关论文
共 25 条
  • [1] ZHANG Y, ZHANG J Y, YANG Z F, Et al., Analysis of the distribution and evolution of energy supply and demand centers of gravity in China, Energy Policy, 49, pp. 695-706, (2012)
  • [2] YI B W, XU J H, FAN Y., Inter-regional power grid planning up to 2030 in China considering renewable energy development and regional pollutant control: A multi-region bottom-up optimization model, Applied Energy, 184, pp. 641-658, (2016)
  • [3] Clean and low-carbon, energy structure transformation [ EB/OL]
  • [4] GUO Libang, DING Yi, BAO Minglei, Et al., An optimal power purchase model of inter-provincial traders in two-level electricity market considering risk man-agement, Power System Technology, 43, 8, pp. 2726-2734, (2019)
  • [5] XU Dan, LIANG Fang, HUANG Guodong, Et al., Security constrained economic dispatch model of inter-provincial power grid considering multi-level dispatch [J], Automation of Electric Power Systems, 43, 22, pp. 94-100, (2019)
  • [6] LI Guoqing, LI Xintong, BIANJing, Two level scheduling strategy for inter-provincial DC power grid considering the uncertainty of PV-load prediction, Proceeding of the CSEE, 41, 14, pp. 4763-4776, (2021)
  • [7] XU Fan, DING Qia, HAN Hongwei, Et al., Power optimization model and analysis of HVDC tie-line for promoting integration of inter-regional renewable energy accommodation, Automation of Electric Power Systems, 41, 18, pp. 152-159, (2017)
  • [8] LI Ji, ZHANG Huiyuan, CHENG Jiehui, Et al., Coordinated and optimal scheduling of inter-regional interconnection system based on source and load status [J], Automation of Electric Power Systems, 44, 17, pp. 26-33, (2020)
  • [9] CHEN Lei, JIANG Fei, YEZe, Compensation model of inter-provincial transfer electricity transaction considering grid operation risk, Power System Technology, 44, 12, pp. 4583-4592, (2020)
  • [10] ZHENG QP, WANGJ H, PARDALOS P M, Et al., A decomposition approach to the two-stage stochastic unit commitment problem, Annals of Operations Research, 210, 1, pp. 387-410, (2013)