共 50 条
- [3] Study on compensation benefits of cascade hydroelectric power stations on Yellow River upstream Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2002, (04):
- [4] RATIONALISATION OF RIVER POWER STATIONS ELEKTROTECHNISCHE ZEITSCHRIFT B-AUSGABE, 1970, 22 (18-1): : 438 - &
- [5] On optimizing operation method at cascade hydro-reservoirs in upper reach of Hanjiang river Wuhan Ligong Daxue Xuebao (Jiaotong Kexue Yu Gongcheng Ban)/Journal of Wuhan University of Technology (Transportation Science and Engineering), 2001, 25 (02):
- [6] Research on the optimal control of power generating and shipping of Hanjiang upstream cascade Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2001, (04):
- [7] WIND POWER STATIONS PERFORMANCE ANALYSIS AND POWER OUTPUT PROGNOSIS 7TH INTERNATIONAL SCIENTIFIC CONFERENCE - ENGINEERING FOR RURAL DEVELOPMENT, PROCEEDINGS, 2008, : 92 - 96
- [8] OUTPUT POWER OF A CASCADE TRANSITIONS LASER KVANTOVAYA ELEKTRONIKA, 1983, 10 (07): : 1431 - 1435
- [9] Output characteristics of tidal current power stations PROCEEDINGS OF THE FOURTEENTH (2004) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1, 2004, : 113 - 119