共 16 条
- [1] Application of online monitoring technology of transmission lines in interconnection project from Qinghai to Tibet Gaodianya Jishu/High Voltage Engineering, 2013, 39 (05): : 1081 - 1088
- [2] Compression Behavior on Precast Concrete Assembly Spread Foundation for Qinghai-Tibet AC/DC Grid Interconnection Project 2013 THIRD INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEM DESIGN AND ENGINEERING APPLICATIONS (ISDEA), 2013, : 466 - 469
- [3] On-line monitoring device for transmission lines and its communication network application Gaodianya Jishu/High Voltage Engineering, 2015, 41 (12): : 3902 - 3908
- [4] Main Problems and Solutions on Design and Construction of Qinghai-Tibet DC Transmission Project in Permafrost Region ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 515 - +
- [6] Analysis of heat transfer characteristics of frozen soil foundation in Qinghai-Tibet DC transmission line project Yu, Q. (yuqh@lzb.ac.cn), 1600, Academia Sinica (32):
- [9] Lightning protection design strategy for transmission lines of the Qinghai-Tibet railway in high altitude permafrost region Gaodianya Jishu/High Voltage Engineering, 2008, 34 (06): : 1095 - 1099
- [10] Fault Analysis and Treatment of Bird Dropping Flashover on ±400kV Qinghai-Tibet DC Transmission Line Dianwang Jishu/Power System Technology, 2020, 44 (03): : 1168 - 1174