DYNAMIC SCHEDULING OF MULTI-AGENT ELECTROMECHANICAL PRODUCTION LINES BASED ON ITERATIVE ALGORITHMS

被引:0
|
作者
Yuan L. [1 ]
机构
[1] College of Mechanical and Electrical Automation, Henan Polytechnic Institute, Henan, Nanyang
来源
Scalable Computing | 2024年 / 25卷 / 03期
关键词
Agent; Genetic algorithm; hierarchical scheduling; Multi-agent;
D O I
10.12694/SCPE.V25I3.2660
中图分类号
学科分类号
摘要
In response to the optimization scheduling problem in the dyeing production process, the author proposes a hierarchical scheduling method for dyeing vats based on genetic algorithm and multi-agent. In this method, a hierarchical scheduling algorithm is used to decompose production scheduling into static and dynamic strategies. The static strategy adopts a genetic algorithm that supports batch processing of multiple products, non equality of equipment, order delivery time, switching cost, and other constraints: Dynamic strategy is a coordinated dynamic optimization algorithm that uses multi-agent systems to support the running status of dye tanks based on static strategies. By solving the algorithm with multiple constraints and dynamic factors in the production process, the final result of the dyeing tank operation task is obtained. The simulation compared pure genetic algorithm with manual scheduling, and the results showed that the hierarchical dynamic scheduling strategy based on data-driven achieved the goal of optimizing the production scheduling of dyeing vats. The practical application results also demonstrate the feasibility of this method. © 2024 SCPE. All Rights Reserved.
引用
收藏
页码:1491 / 1498
页数:7
相关论文
共 50 条
  • [1] DYNAMIC SCHEDULING OF MULTI-AGENT ELECTROMECHANICAL PRODUCTION LINES BASED ON ITERATIVE ALGORITHMS
    Yuan, Lulu
    SCALABLE COMPUTING-PRACTICE AND EXPERIENCE, 2024, 25 (03): : 1491 - 1498
  • [2] Production Dynamic Scheduling among Factories Based on Multi-Agent
    Qin, Ling
    Kan, Shulin
    INTELLIGENT SYSTEM AND APPLIED MATERIAL, PTS 1 AND 2, 2012, 466-467 : 1386 - 1391
  • [3] A Hybrid System Dynamic Production Scheduling Method Based On Multi-Agent
    Ma, Xiaofeng
    2012 INTERNATIONAL CONFERENCE ON INDUSTRIAL CONTROL AND ELECTRONICS ENGINEERING (ICICEE), 2012, : 179 - 181
  • [4] Production Dynamic Scheduling Method Based on Improved Contract Net of Multi-agent
    Qin, Ling
    Kan, Shulin
    INTELLIGENCE COMPUTATION AND EVOLUTIONARY COMPUTATION, 2013, 180 : 929 - 936
  • [5] Multi-agent based framework for dynamic scheduling system
    Zhang, Xiao-Dong
    Wang, Qian
    Li, Xiao-Ping
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 3838 - 3843
  • [6] Multi-agent system for dynamic scheduling
    Firme, Bernardo
    Lopes, Guilherme
    Martins, Miguel S. E.
    Coito, Tiago
    Viegas, Joaquim
    Sousa, Joao M. C.
    Reis, Joao C. P.
    Figueiredo, Joao
    Vieira, Susana
    2020 INTERNATIONAL JOINT CONFERENCE ON NEURAL NETWORKS (IJCNN), 2020,
  • [7] Stochastic reactive production scheduling by multi-agent based asynchronous approximate dynamic programming
    Csáji, BC
    Monostori, L
    MULTI-AGENT SYSTEMS AND APPLICATIONS IV, PROCEEDINGS, 2005, 3690 : 388 - 397
  • [8] Competitive multi-agent scheduling with an iterative selection rule
    Nicosia, Gaia
    Pacifici, Andrea
    Pferschy, Ulrich
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2018, 16 (01): : 15 - 29
  • [9] Competitive multi-agent scheduling with an iterative selection rule
    Gaia Nicosia
    Andrea Pacifici
    Ulrich Pferschy
    4OR, 2018, 16 : 15 - 29
  • [10] Multi-agent based dynamic scheduling for a flexible assembly system
    Chen, YY
    Fu, LC
    Chen, YC
    1998 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-4, 1998, : 2122 - 2127