共 50 条
- [1] BURIED CONCRETE PIPE EMBANKMENT INSTALLATION ANALYSIS JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1986, 112 (06): : 576 - 592
- [2] BURIED CONCRETE PIPE TRENCH INSTALLATION ANALYSIS JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1987, 113 (05): : 485 - 501
- [3] The Research of Heat Loss Calculation Model of Directly-buried Heating Pipe Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 2106 - 2110
- [5] Research on Explosion Damage Effect of Directly Buried Through Pipe Optical Cable in Sand Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 2022, 42 (04): : 366 - 373
- [8] Optimization study on laying and installation of conjugated directly-buried heating pipes INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY AND GREEN TECHNOLOGY 2018, 2019, 268
- [9] A Study of the Preheating Temperature of Directly Buried Heat-Supply Pipeline Based On Intermediate Stress 6TH INTERNATIONAL SYMPOSIUM ON HEATING, VENTILATING AND AIR CONDITIONING, VOLS I-III, PROCEEDINGS, 2009, : 1609 - 1615
- [10] A study of the preheating temperature of directly buried heat-supply pipelines based on average stress Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2010, 42 (12): : 1985 - 1989