Risk assessment of deep foundation pit by using fuzzy comprehensive evaluation method based on bayesian networks

被引:0
|
作者
Zhou, Hong-Bo [1 ,2 ]
机构
[1] Shanghai Research Institute of Building Sciences, Shanghai 200032, China
[2] Shanghai Jianke Project Management Co., Ltd, Shanghai 200032, China
关键词
Risk assessment;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1473 / 1479
相关论文
共 50 条
  • [1] Risk Assessment of Building Foundation Pit Construction Based on Fuzzy Hierarchical Comprehensive Evaluation Method
    Li, Lei
    Li, Ruihan
    Zhi, Mei
    Wang, Siwei
    Cao, Lirong
    GEOFLUIDS, 2022, 2022
  • [2] Flight Risk Assessment to Airlines Using Bayesian Belief Networks and Fuzzy Comprehensive Evaluation
    Ding Songbin
    Ru Yi
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1280 - 1284
  • [3] Identification and evaluation of deep foundation pit construction risks based on Grey-DEMATEL-Fuzzy comprehensive evaluation method
    Hao, Hu
    Jian, He
    Liu, Peiling
    Cong, Zhu
    PLOS ONE, 2024, 19 (08):
  • [4] Stability Evaluation of Deep Foundation Pit Based on RBF-AHP-Fuzzy Comprehensive Evaluation Model
    Liu, Zhongning
    He, Pengfei
    Liu, Shuangqiang
    2022 IEEE INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING, BIG DATA AND ALGORITHMS (EEBDA), 2022, : 963 - 966
  • [5] A fuzzy evidential reasoning-based approach for risk assessment of deep foundation pit
    Wei, Daojiang
    Xu, Dongsheng
    Zhang, Yong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 97
  • [6] Risk Assessment of Deep Foundation Pit Construction Based on Analytic Hierarchy Process and Fuzzy Mathematics
    Meng, Guowang
    Huang, Jingsong
    Wu, Bo
    Zhu, Yanping
    Xu, Shixiang
    Hao, Jianhua
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [7] Fuzzy comprehensive evaluation study on optimization analysis of retaining system for deep foundation pit
    Ying, LA
    Xia, HL
    ICEMI 2005: Conference Proceedings of the Seventh International Conference on Electronic Measurement & Instruments, Vol 8, 2005, : 523 - 528
  • [8] Coupling Evaluation Method of the Construction Risk for Subway Deep Foundation Pit
    Wang, Qian-Kun
    Kang, Xian-Wei
    Zhu, Ke
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2021, 42 (08): : 1152 - 1158
  • [9] Risk assessment of virtual enterprise based on the fuzzy comprehensive evaluation method
    School of Business, Hubei University, 430062, China
    IFIP Advances in Information and Communication Technology, 2007, (58-66)
  • [10] Risk assessment of virtual enterprise based on the fuzzy comprehensive evaluation method
    Liu, Gang
    Zhang, Jiao
    Zhang, Wangmin
    Zhou, Xian
    INTEGRATION AND INNOVATION ORIENT TO E-SOCIETY, VOL 1, 2007, 251 : 58 - +