共 50 条
- [1] Instrumentation and control of reactor and coolant system for Qinshan phase II NPP project Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 227 - 230
- [2] Control rod drive line cold test research of Qinshan phase II NPP project Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 155 - 157
- [3] Design of inadequate core cooling monitoring system in Qinshan phase II extension project Hedongli Gongcheng/Nuclear Power Engineering, 2008, 29 (01): : 5 - 9
- [4] Improvements of Qinshan Phase II Fuel Operation Control System Equipment and Its Implementation Hedongli Gongcheng/Nuclear Power Engineering, 2021, 42 : 168 - 172
- [5] Design of CRDM for Qinshan phase II NPP project Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 161 - 164
- [6] Severe accident research for Qinshan phase II NPP project Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 36 - 39
- [7] Source terms calculation analysis for the reactor and primary coolant system of Qinshan phase II NPP project Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 73 - 77
- [8] Application of nuclear safety principle for reactor protection system in QinShan phase II NPP extension project Hedongli Gongcheng/Nuclear Power Engineering, 2009, 30 (SUPPL. 1): : 44 - 47
- [9] Design of relief tank for Qinshan Phase II nuclear power project Hedongli Gongcheng/Nuclear Power Engineering, 1999, 20 (05): : 421 - 423
- [10] STUDY ON THE SBO COPING CAPABILITY FOR QINSHAN PHASE II UNIT 3 PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 6, 2014,