Challenge to achieve 10,000 tonnes per day of biomass

被引:0
|
作者
Voß, Christof [1 ]
机构
[1] Osters and Voß GmbH, Groß Gottschow
来源
VDI Berichte | 2009年 / 2055期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:11 / 17
相关论文
共 50 条
  • [1] Are 10,000 steps per day enough?
    Kornhuber, Johannes
    FORTSCHRITTE DER NEUROLOGIE PSYCHIATRIE, 2017, 85 (07) : 381 - 382
  • [2] Challenge 10.000 tonnes biomass in a day
    Voss, Christof
    AGRICULTURAL ENGINEERING FOR PROFESSIONALS, 2009, 2055 : 11 - 17
  • [3] Effects of a 10,000 steps per day goal in overweight adults
    Schneider, Patrick L.
    Bassett, David R., Jr.
    Thompson, Dixie L.
    Pronk, Nicolaas P.
    Bielak, Kenneth M.
    AMERICAN JOURNAL OF HEALTH PROMOTION, 2006, 21 (02) : 85 - 89
  • [4] 10,000 HOLES PER TAP
    KAPPKE, G
    MODERN MACHINE SHOP, 1984, 57 (01) : 50 - 55
  • [5] Are 10,000 Steps Per Day Predictive of Meeting Physical Activity Guidelines?
    Craft, Lynette L.
    Zderic, Theodore
    Siddique, Juned
    Gapstur, Susan M.
    Hamilton, Marc
    MEDICINE AND SCIENCE IN SPORTS AND EXERCISE, 2014, 46 (05): : 500 - 501
  • [6] THE CINOLA DEPOSIT - A POTENTIAL 10,000 TON PER DAY GOLD PRODUCER
    SUTHERLAND, WD
    SANDERS, KG
    CANADIAN MINING JOURNAL, 1981, 102 (04) : 69 - &
  • [7] COBRIZA INCREASING MINE PODUCTION TO 10,000 TONS PER DAY.
    Leon V., Arnaldo
    Illich E., Luis
    1978, 31 (03): : 76 - 79
  • [8] Are 10,000 steps a day sufficient?
    Marx, H
    Burrington, C
    Reed, R
    OBESITY RESEARCH, 2003, 11 : A103 - A103
  • [9] 10,000 FOAM MOLDINGS A DAY
    不详
    MODERN PLASTICS, 1970, 47 (07): : 85 - &
  • [10] CINOLA DEPOSIT - A POTENTIAL 10,000 TON PER DAY GOLD PRODUCER.
    Sutherland, Don W.
    Sanders, K.G.
    Canadian Mining Journal, 1981, 102 (04)