Research on short-term optimization operation of cascade hydropower stations

被引:0
|
作者
Xie, Hongsheng [1 ]
Wu, Xianglin [1 ]
Chen, Yang [1 ]
Zhao, Yong [1 ]
Ran, Guangcan [2 ]
机构
[1] Institute of System Engineering, Huazhong Univ. of Sci. and Technol., Wuhan 430074, China
[2] Preparatory Office of Nuozhadu Hydropower Project, Yunnan Huaneng Lancang River Hydropower Co. Ltd., Simao 665625, China
关键词
Reservoirs; (water);
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1 / 7
相关论文
共 50 条
  • [1] Optimal short-term operation of a cascade of hydropower stations
    Wolf, AJ
    Lindberg, PO
    HYDRAULIC ENGINEERING SOFTWARE VI, 1996, : 215 - 221
  • [2] Study on optimization of the short-term operation of cascade hydropower stations by considering output error
    Wang, Liping
    Wang, Boquan
    Zhang, Pu
    Liu, Minghao
    Li, Chuangang
    JOURNAL OF HYDROLOGY, 2017, 549 : 326 - 339
  • [3] Short-term hydro generation operation of cascade hydropower stations in Han River, China
    Zhang, Rui
    Wang, Xuemin
    Yu, Shan
    Zou, Qiang
    2018 3RD ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2018), 2018, 366
  • [4] Short-Term Joint Optimization of Cascade Hydropower Stations on Daily Power Load Curve
    Yuan, Liu
    Zhou, Jianzhong
    Chang, Chuyang
    Lu, Peng
    Wang, Chao
    Tayyab, Muhammad
    2016 IEEE INTERNATIONAL CONFERENCE ON KNOWLEDGE ENGINEERING AND APPLICATIONS (ICKEA 2016), 2016, : 236 - 240
  • [5] Quantifying streamflow predictive uncertainty for the optimization of short-term cascade hydropower stations operations
    Liu, Yuan
    Ji, Changming
    Wang, Yi
    Zhang, Yanke
    Hou, Xiaoning
    Xie, Yutao
    JOURNAL OF HYDROLOGY, 2022, 605
  • [6] Discussion on the short-term weekly optimal scheduling of cascade hydropower stations
    Li, Liang
    Zhou, Yun
    Huang, Qiang
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2009, 28 (04): : 38 - 42
  • [7] Cascade hydropower stations short-term operation for load distribution considering water level synchronous variation
    Lei, Kaixuan
    Chang, Jianxia
    Wang, Yimin
    Guo, Aijun
    Huang, Mengdi
    Xu, Bo
    RENEWABLE ENERGY, 2022, 196 : 683 - 693
  • [8] Particle Swarm Optimization for Long-term Operation of Cascade Hydropower Stations
    Chen Lihua
    Zhao Yakun
    Mei Yadong
    Yang Na
    2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [9] Application of immune particle swarm optimization algorithm to short-term optimal dispatch of cascade hydropower stations
    Wuhan University, Wuhan 430072, China
    不详
    不详
    Shuili Xuebao, 2008, 4 (426-432):
  • [10] Study on short-term peak load of Xiaolangdi and Xixiayuan cascade hydropower stations
    Bai, Tao
    Chang, Jianxia
    Fang, Jianxi
    Huang, Qiang
    Zhu, Xuping
    Liao, Xinyu
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2012, 31 (04): : 83 - 88