共 50 条
- [2] Inverse Method: Deep Foundation Pit Construction GEOTECHNICAL ENGINEERING, 2022, 53 (04): : 9 - 12
- [3] DYNAMIC CONSTRUCTION CONTROL METHOD FOR A DEEP FOUNDATION PIT WITH SAND-PEBBLE GEOLOGY CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2020, 29 (03): : 293 - 305
- [5] Simulation analysis on deep foundation pit construction near the history style construction CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 113 - +
- [7] Dynamic Optimization of Construction Time-Cost for Deep and Large Foundation Pit Based on BIM Technology and Genetic Algorithm APPLIED SCIENCES-BASEL, 2023, 13 (19):
- [8] The technique of Deep Foundation Pit and Pile Foundation Construction PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 308 - 311
- [9] Research on BIM-based Subway Foundation Pit Engineering Simulation Method CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 338 - 345
- [10] Coupling Evaluation Method of the Construction Risk for Subway Deep Foundation Pit Dongbei Daxue Xuebao/Journal of Northeastern University, 2021, 42 (08): : 1152 - 1158