Numerical simulation of back sublevel fill stoping with parallelogramic stope structure

被引:0
|
作者
Zhang, Guo-Lian [1 ]
Zhao, Xing-Dong [1 ]
Yang, Yu-Jiang [1 ]
机构
[1] School of Resources and Civil Engineering, Northeastern University, Shenyang 110004, China
关键词
Stoping;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:722 / 725
相关论文
共 50 条
  • [2] The sublevel inclined cut-and-fill stoping system
    Mendelsohn, A
    Jackson, CF
    TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1932, 102 : 43 - 58
  • [3] Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations
    Copland, T.
    Nehring, M.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2016, 116 (12) : 1135 - 1142
  • [4] Clustering-based iterative approach to stope layout optimization for sublevel stoping
    Sari, Y. A.
    Kumral, M.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2021, 121 (03) : 97 - 106
  • [5] Sublevel open and fill stoping method used in the Hedong Gold Mine
    Cai, SJ
    Ma, YS
    Wang, JQ
    Jia, HY
    MINEFILL'98, 1998, 98 (01): : 289 - 291
  • [6] Study on Sublevel Open Stoping with Subsequent Backfilling Mining Method Stope Parameters Optimization
    Song, Weidong
    Wang, Dongxu
    Tang, Yanan
    ADVANCED BUILDING MATERIALS, PTS 1-4, 2011, 250-253 (1-4): : 1567 - 1571
  • [7] A planning approach for polymetallic mines using a sublevel stoping technique with pillars and ultimate stope limits
    Sari, Yuksel Asli
    Kumral, Mustafa
    ENGINEERING OPTIMIZATION, 2020, 52 (06) : 932 - 944
  • [8] Managing grade risk in stope design optimisation: probabilistic mathematical programming model and application in sublevel stoping
    Grieco, N.
    Dimitrakopoulos, R.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2007, 116 (02): : 49 - 57
  • [9] Numerical analysis on stope parameters for stoping-and-filling with transverse strips
    Chen, H.
    Cheng, G.-J.
    Kuang Yeh/Mining and Metallurgy, 2001, 10 (03): : 1 - 5
  • [10] Optimisation of stoping parameters for a cut and fill stope at Chikla mine of MOIL Ltd: A case study
    Raju, G. D.
    Jain, Prasnna
    Venkateswarlu, V.
    Babu, A. Rajan
    Manekar, G. G.
    PROCEEDINGS OF THE CONFERENCE ON RECENT ADVANCES IN ROCK ENGINEERING (RARE 2016), 2016, 91 : 440 - 445