Investigation and planning for the refurbishment of the original Tauern Tunnel

被引:0
|
作者
Kohlböck B. [1 ]
Moser H. [2 ]
机构
[1] IGT Geotechnik und Tunnelbau ZT GmbH, 5020 Salzburg
[2] Asfinag Bau Management GmbH, 5582 St. Michael
来源
Geomechanik und Tunnelbau | 2010年 / 3卷 / 04期
关键词
Tunnels;
D O I
10.1002/geot.201000029
中图分类号
学科分类号
摘要
The extent of tunnel refurbishment has increased constantly in recent years. The particular importance of meticulous and thought-out planning has been demonstrated on recent projects. The original drawings often provide an insufficient basis for design work and have to be checked, verified or supplemented by targeted investigation measures. A brief glance at the list of claims from a refurbishment project can clearly demonstrate the potential savings, which could have been produced by relatively cheap investigations. For the planning and design of the refurbishment of the first tube of the Tauern Tunnel, many staged investigation surveys were therefore carried out. The investigation measures carried out and their results and effect on the design and tender documents for the refurbishment of the existing tube of the Tauern Tunnel are described in this article. © 2010 Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH & Co. KG, Berlin.
引用
收藏
页码:379 / 390
页数:11
相关论文
共 50 条
  • [1] Refurbishment of old railway tunnels using the Tauern Tunnel as an example
    Moritz, Bernd
    Themessl, Florian
    Höhndorf, Markus
    Helmberger, Albert
    Geomechanik und Tunnelbau, 2024, 17 (05): : 482 - 494
  • [2] Investigation and analysis procedures for tunnel refurbishment
    Sandrone, F.
    Oggeri, C.
    Del Greco, O.
    ROCK MECHANICS IN CIVIL AND ENVIRONMENTAL ENGINEERING, 2010, : 521 - 524
  • [3] First and second tube of the Tauern Tunnel
    Ayaydin, Nejad
    Geomechanik und Tunnelbau, 2010, 3 (04):
  • [4] Mechanical systems in the construction of the Tauern tunnel
    Brabbee, K
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1907, 51 : 805 - 813
  • [5] The rebuilding of the ventilation cavern at the Tauern Tunnel
    Bacher M.
    Brandtner M.
    Kohlböck B.
    Santner J.
    Geomechanik und Tunnelbau, 2010, 3 (04): : 355 - 364
  • [6] The refurbishment strategy of the Seelisberg Tunnel
    Marty, R.
    Schaedler, B.
    Frey, D.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 520 - 527
  • [7] Innovative method of rail tunnel refurbishment
    Wetzig, V.
    Baumann, K.
    Riedl, A.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 505 - 511
  • [8] SPACE TELESCOPE - PLANNING FOR REFURBISHMENT
    DAVID, P
    NATURE, 1983, 304 (5922) : 107 - 107
  • [9] The tunnel-air equipment of Tauern-railway.
    Schumann, R
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1915, 59 : 321 - 324
  • [10] NEW APPROACH OF ASFINAG FOR TUNNEL CONSTRUCTION MONITORING OF THE TAUERN TUNNEL PROJECT IN AUSTRIA
    Schnabl, Robert
    Mayr, Josef P.
    2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 2009, : 308 - 319