共 50 条
- [1] Analysis of grounding modes of 110 kV side of transformer in 220 kV substation Gaodianya Jishu/High Voltage Engineering, 2007, 33 (12): : 157 - 161
- [2] Operation analysis of spare power automatic switch device after 110 kV circuit breaker manually opening in Luojiazhuang transformer substation Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (05): : 141 - 142
- [3] Analysis of a maloperation of transformer's backup protection in 110 kV Zhaodong station Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2009, 37 (09): : 120 - 122
- [4] Analysis of a main transformer's differential relay operation in a 110 kV substation Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (04): : 134 - 136
- [5] Analysis of the Failure of Backup Automatic Switch in Substation PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON ELECTRONIC, MECHANICAL, INFORMATION AND MANAGEMENT SOCIETY (EMIM), 2016, 40 : 1166 - 1170
- [6] Analysis for a power transmission operation accident in 220 kV transformer substation Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (24): : 206 - 208
- [7] Analysis of mal-operation of transformer's differential protection in a 110 kV substation Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2005, 29 (19): : 87 - 89
- [8] Causes analysis and suppression measures of corona discharge in Nanchong 500 kV substation Gaodianya Jishu/High Voltage Engineering, 2010, 36 (09): : 2265 - 2271
- [9] Fault analysis of 110 kV substation PT Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2010, 30 (10): : 139 - 140
- [10] Research On Main Transformer Capacity Configuration Of 110∼35kv Substation Based On Different Power Regions 2014 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2014,